ETCM 4370-Fall 2023- Quiz 1

ETCM 4370-Fall 2023- Quiz 1

University

10 Qs

quiz-placeholder

Similar activities

Minecraft

Minecraft

KG - Professional Development

8 Qs

Research Sampling

Research Sampling

University

15 Qs

RE Vocabulary 04 2024

RE Vocabulary 04 2024

University

10 Qs

INTRO TO CLASSIFICATION

INTRO TO CLASSIFICATION

KG - University

12 Qs

Emphasis (Advanced)

Emphasis (Advanced)

University

12 Qs

Quiz 2 Proses Manufaktur

Quiz 2 Proses Manufaktur

University

13 Qs

Modal Verbs

Modal Verbs

University

10 Qs

QUIZ TQM MAC 2023

QUIZ TQM MAC 2023

University

15 Qs

ETCM 4370-Fall 2023- Quiz 1

ETCM 4370-Fall 2023- Quiz 1

Assessment

Quiz

University

Practice Problem

Medium

Created by

Momen Mousa

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the design bid build, the owner selects the architect--------

based on qualifications

based on price

based on qualifications and price

None of the previous

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After the owner accepts the architect's fee proposal, which of these statements is true?

The architect will submit a proposal to the owner

The owner issues a request for proposal

An “Owner-Architect Contract” is established

The owner issues a request for proposal then a contract is signed

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is typically shown in a fee proposal?

Owner's responsibilities

Architect's basic services

Architect's additional services

All of the previous

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The standard form of agreement between the owner and architect is ------

Document A101

Document A201

Document B201

Document B101

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The standard form of agreement between the owner and contractor is ------

Document A101

Document A201

Document B201

Document B101

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A contractor submitted a bid to a public agency (TxDOT as an example), the bid was accepted, and a contract was established. If this contractor then decided to withdraw the bid, then the contractor is obligated to pay up to 100% of the-------

Bid

Performance bond

Contract

Bid bond

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the bidding process, the bill of quantities is determined by the ---------

Contractor

The designer and approved by the owner

The contractor and approved by the owner

The owner and approved by the contractor

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?