1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity respectively, the expected time t of the activity will be

to+3tm+tp/2

to+3tm+tp/3

to+4tm+tp/5

to+4tm+tp/6

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A construction schedule is prepared after collecting

Number of operations

Output of labour

Output of machinery

All the above

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Bar charts are suitable for

Minor works

Major works

Large projects

All the Above

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The Overall in-charge of an organization at the site responsible for the execution of the works, is

Executive Engineer

Engineer

Junior Engineer

Assistant Engineer

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The main principle of an organization, is

Unity of command

Effective control at all levels

Delegation of authority

All the above

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A dummy activity

Is artificially introduced

Is represented by a dotted line

Does not consume time

All the above

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Critical path lies along the activities having total float

Positive

Negative

Zero

Same

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?