103W2B

103W2B

Professional Development

40 Qs

quiz-placeholder

Similar activities

COMPLEMENTOS VERBALES

COMPLEMENTOS VERBALES

Professional Development

43 Qs

UPC Chapter 2

UPC Chapter 2

Professional Development

37 Qs

Engines Fun

Engines Fun

Professional Development

35 Qs

Evaluación mes 1.

Evaluación mes 1.

University - Professional Development

40 Qs

Perakitan produk barang / jasa

Perakitan produk barang / jasa

KG - Professional Development

37 Qs

IMI AUTOMOTVE KNOWLEDGE

IMI AUTOMOTVE KNOWLEDGE

Professional Development

43 Qs

Health and Safety Revision

Health and Safety Revision

Professional Development

38 Qs

Cold water 1

Cold water 1

Professional Development

40 Qs

103W2B

103W2B

Assessment

Quiz

Specialty

Professional Development

Practice Problem

Hard

Created by

Rizwan Rizwan

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is the initial basis for testing information?

A) Historical performance data
B) Manufacturer's specifications
C) Equipment maintenance records
D) Testing standards and regulations

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

How can testing specifications and data be used beyond initial testing?

A) To determine maintenance schedules
B) To compare against historical performance
C) To set new industry standards
D) To design new equipment

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What method is commonly used for carrying out soundness tests and certification?

A) Electrical testing
B) Hydrostatic/pneumatic methods
C) Magnetic resonance imaging (MRI)
D) Visual inspections

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What document provides instructions for safe use and highlights potential hazards associated with materials, products, or processes?

A) Maintenance/Inspection documents
B) Safety work sheet (SWS)
C) Material safety data sheet (MSDS)
D) Inspection Data Records (IDR)

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What does ITP stand for in the context of engineering work?

A) Internal Testing Protocol
B) Inspection and Test Plan
C) In-Service Testing Procedure
D) Internal Technical Procedure

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

In which stages of engineering work are Inspection and Test Plans (ITPs) used?

A) Only during the construction phase
B) During manufacture, construction, and operation phases
C) Only during the operation phase
D) During maintenance and repair phases

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is the main purpose of an Inspection Method Statement?

A) To provide historical performance data
B) To outline the hazards involved in an inspection
C) To capture comments and results from readings
D) To describe the company's organizational structure

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?