103 W2C

103 W2C

Professional Development

30 Qs

quiz-placeholder

Similar activities

An toàn Điện Bậc 3

An toàn Điện Bậc 3

Professional Development

25 Qs

GESTORAS Y GESTORES

GESTORAS Y GESTORES

Professional Development

27 Qs

Compliance Workshop Quiz

Compliance Workshop Quiz

KG - Professional Development

26 Qs

DIESEL ENGINES 1 FUNDAMENTALS

DIESEL ENGINES 1 FUNDAMENTALS

12th Grade - Professional Development

35 Qs

Salesforce Admin Quiz 2

Salesforce Admin Quiz 2

University - Professional Development

31 Qs

Chapter III: Steam Boiler Fittings

Chapter III: Steam Boiler Fittings

Professional Development

25 Qs

Formatif suspension

Formatif suspension

Professional Development

25 Qs

Be Internet Awesome Pre-test

Be Internet Awesome Pre-test

Professional Development

25 Qs

103 W2C

103 W2C

Assessment

Quiz

Specialty

Professional Development

Hard

Created by

Rizwan Rizwan

Used 2+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is the initial basis for testing information?
A) Historical performance data
B) Manufacturer's specifications
C) Equipment maintenance records
D) Testing standards and regulations

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

How can testing specifications and data be used beyond initial testing?
A) To determine maintenance schedules
B) To compare against historical performance
C) To set new industry standards
D) To design new equipment

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What method is commonly used for carrying out soundness tests and certification?
A) Electrical testing
B) Hydrostatic/pneumatic methods
C) Magnetic resonance imaging (MRI)
D) Visual inspections

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What document provides instructions for safe use and highlights potential hazards associated with materials, products, or processes?
A) Maintenance/Inspection documents
B) Safety work sheet (SWS)
C) Material safety data sheet (MSDS)
D) Inspection Data Records (IDR)

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What does ITP stand for in the context of engineering work?
A) Internal Testing Protocol
B) Inspection and Test Plan
C) In-Service Testing Procedure
D) Internal Technical Procedure

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

In which stages of engineering work are Inspection and Test Plans (ITPs) used?
A) Only during the construction phase
B) During manufacture, construction, and operation phases
C) Only during the operation phase
D) During maintenance and repair phases

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is the main purpose of an Inspection Method Statement?
A) To provide historical performance data
B) To outline the hazards involved in an inspection
C) To capture comments and results from readings
D) To describe the company's organizational structure

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?