The railroad was not the first institution to impose regularity on society, or to draw attention to the importance of precise timekeeping. For as long as merchants have set out their wares at daybreak and communal festivities have been celebrated, people have been in rough agreement with their neighbors as to the time of day.
The value of this tradition is today more apparent than ever. Were it not for public acceptance of a single yardstick of time, social life would be unbearably chaotic: the massive daily transfers of goods, services, and information would proceed in fits and starts; the very fabric of modern society would begin to unravel.
What is the main idea of the passage?
In modern society we must make more time for our neighbors.
The traditions of society are timeless.
An accepted way of measuring time is essential for the smooth functioning of society.
Society judges people by the times at which they conduct certain activities.
2.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
The railroad was not the first institution to impose regularity on society, or to draw attention to the importance of precise timekeeping. For as long as merchants have set out their wares at daybreak and communal festivities have been celebrated, people have been in rough agreement with their neighbors as to the time of day.
The value of this tradition is today more apparent than ever. Were it not for public acceptance of a single yardstick of time, social life would be unbearably chaotic: the massive daily transfers of goods, services, and information would proceed in fits and starts; the very fabric of modern society would begin to unravel.
According to the second paragraph, the phrase “this tradition” refers to?
The practice of starting the business day at dawn
Friendly relations between neighbors
The railroad’s reliance on time schedules
People’s agreement on the measurement of time
3.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at [4]a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate.
The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily.
[15]Resting on H-shaped steel racks called “bents,” long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline’s up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or [23]permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil.
One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so eight major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the [37]size of its holdings. Today, despite enormous problems of climate, supply shortages, equipment breakdowns, labor disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
The passage primarily discusses the pipeline’s.......
Operating costs
Employees
Consumers
Construction
4.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at [4]a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate.
The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily.
[15]Resting on H-shaped steel racks called “bents,” long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline’s up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or [23]permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil.
One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so eight major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the [37]size of its holdings. Today, despite enormous problems of climate, supply shortages, equipment breakdowns, labor disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
The yellow highlighted word “it” in paragraph 1 refers to the......
Pipeline
Ocean
State
Village
5.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at [4]a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate.
The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily.
[15]Resting on H-shaped steel racks called “bents,” long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline’s up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or [23]permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil.
One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so eight major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the [37]size of its holdings. Today, despite enormous problems of climate, supply shortages, equipment breakdowns, labor disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
According to the second paragraph, 84 million gallons of oil can travel through the pipeline each.....
Day
Week
Month
Year
6.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at [4]a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate.
The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily.
[15]Resting on H-shaped steel racks called “bents,” long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline’s up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or [23]permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil.
One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so eight major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the [37]size of its holdings. Today, despite enormous problems of climate, supply shortages, equipment breakdowns, labor disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
The phrase “Resting on” in paragraph 3 is closest in meaning to......
Consisting of
Supported by
Passing under
Protected with
7.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at [4]a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate.
The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily.
[15]Resting on H-shaped steel racks called “bents,” long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline’s up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or [23]permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil.
One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so eight major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the [37]size of its holdings. Today, despite enormous problems of climate, supply shortages, equipment breakdowns, labor disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
The author mentions all of the following in the third paragraph as important in determining the pipeline’s route EXCEPT the.....
Climate
Lay of the land itself
Local vegetation
Kind of soil and rock
Create a free account and access millions of resources
Similar Resources on Wayground
15 questions
b2 vocabulary quiz

Quiz
•
7th Grade - University
15 questions
The Face of the Deep Is Frozen

Quiz
•
5th Grade - University
15 questions
Frozen Fun

Quiz
•
4th Grade - University
10 questions
Disney

Quiz
•
KG - University
15 questions
Disney Alphabet

Quiz
•
3rd Grade - University
15 questions
Grammar-focused Games

Quiz
•
University
15 questions
PHONETICS: Consonant Clusters Quiz

Quiz
•
University
12 questions
Reading Comprehension Skills_Basic Level

Quiz
•
10th Grade - University
Popular Resources on Wayground
55 questions
CHS Student Handbook 25-26

Quiz
•
9th Grade
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
10 questions
Chaffey

Quiz
•
9th - 12th Grade
15 questions
PRIDE

Quiz
•
6th - 8th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
22 questions
6-8 Digital Citizenship Review

Quiz
•
6th - 8th Grade
10 questions
Nouns, nouns, nouns

Quiz
•
3rd Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade