Ch 17 Review

Ch 17 Review

University

11 Qs

quiz-placeholder

Similar activities

LEARNING FOR FUTURE SEMESTER 3

LEARNING FOR FUTURE SEMESTER 3

University

10 Qs

Budgeting & Variance Quiz

Budgeting & Variance Quiz

University

6 Qs

Acct 2920 Ch 2 Quiz

Acct 2920 Ch 2 Quiz

University

10 Qs

Direct Variation Review

Direct Variation Review

9th Grade - University

15 Qs

PROFIT LOSS DISCOUNT

PROFIT LOSS DISCOUNT

University

10 Qs

Basic Math

Basic Math

1st Grade - University

14 Qs

ABM101 -EXAM

ABM101 -EXAM

University

16 Qs

Acct 2920 Ch 8 Quiz

Acct 2920 Ch 8 Quiz

University

10 Qs

Ch 17 Review

Ch 17 Review

Assessment

Quiz

Mathematics

University

Hard

Created by

Jolie Hirsch

Used 5+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the relevant activity base for traditional based costing? 

Machine hours 

Direct labor hours 

Direct materials hours  

Manufacturing hours 

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an activity cost pool? 

The total overhead cost in a company  

An activity that has a cause-effect relationship with the resource consumed 

The overhead cost attributed to a distinct activity 

The overhead cost for a specific job 

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an example of a cost driver? 

Machining  

Ordering materials 

Factory supervising 

Number of setups 

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A low degree of correlation must exist between the cost driver and the cost pool. 

true

false

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the formula for the activity-based overhead rate? 

Est. total overhead cost / est. use of activity base 

Est. overhead per activity / est. use of cost driver per activity 

Actual overhead per activity / actual use of cost driver per activity 

Actual total overhead cost / actual use of activity base 

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If I calculated the ABC rate with machine hours, what should I multiply it by to find the applied overhead? 

Actual machine setup 

Estimated machine setup 

Estimated machine hours 

Actual machine hours 

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If I produce a group of products at a time, what activity would that be considered?  

Product-level 

Batch-level 

Unit-level 

Facility-level 

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Mathematics