MCQ- SLIP TEST

MCQ- SLIP TEST

University

10 Qs

quiz-placeholder

Similar activities

Young Sheldon Ep9

Young Sheldon Ep9

University

12 Qs

e-Businnes Global e Colaboração

e-Businnes Global e Colaboração

University

10 Qs

Units & Dimensions

Units & Dimensions

University

10 Qs

Diagnostik Matematika

Diagnostik Matematika

12th Grade - University

15 Qs

Discrete Time Systems

Discrete Time Systems

University

10 Qs

Quiz Sudut Matematika

Quiz Sudut Matematika

6th Grade - University

15 Qs

Clock & Calendar

Clock & Calendar

11th Grade - Professional Development

15 Qs

MATH 14 QUIZ 3 - DATA COLLECTION (Observation and Case Study)

MATH 14 QUIZ 3 - DATA COLLECTION (Observation and Case Study)

University

10 Qs

MCQ- SLIP TEST

MCQ- SLIP TEST

Assessment

Quiz

Mathematics

University

Practice Problem

Medium

CCSS
HSS.MD.B.6, HSS.MD.B.7

Standards-aligned

Created by

Djose loyolite

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

No machine can process more than --------------- operation at a time.

One

Two

Three

Four

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The time required to transfer the jobs between machines is -----------------.

High

Low

Moderate

Negligible

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a sequencing problem, --------------- rule is mentioned

Johnson

Time

No passing rule

Job changing

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a sequencing problem the total elapsed time should be-----------------.

Maximum

Negligible

Minimum

Not be defined

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In sequencing problem, the order of completion of jobs is called

completion sequence

job sequence

processing order

job order

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Forward pass calculations are done to find occurrence times of events.

exact

earliest

latest

approximate

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The second longest path in the network diagram is called path.

alternate

feasible

sub-critical

critical

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?