Make or buy

Make or buy

Professional Development

10 Qs

quiz-placeholder

Similar activities

Trg@home 1

Trg@home 1

Professional Development

10 Qs

Pre and Post Test

Pre and Post Test

Professional Development

10 Qs

Pre & Post Test QCC

Pre & Post Test QCC

Professional Development

10 Qs

Microsoft 365

Microsoft 365

Professional Development

11 Qs

Interactive Game for WP Develophilia ID Batch 1

Interactive Game for WP Develophilia ID Batch 1

KG - Professional Development

15 Qs

SLS PS 2.0 Types of Learning Experiences (LE)

SLS PS 2.0 Types of Learning Experiences (LE)

Professional Development

10 Qs

Pivot Tables

Pivot Tables

Professional Development

10 Qs

Soal PPPK Pedagogik 4

Soal PPPK Pedagogik 4

Professional Development

15 Qs

Make or buy

Make or buy

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Hard

Created by

Claudia Galván

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 5 pts

The following cases it should be made in-house from the beginning.

When self-development is desired and the added value of domestic production is to be increased

If there is any risk in a new developed product

When research and development of new methods and new equipment are desired

All of the above

2.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

Is the PUR department responsible for the launching of drawings and parts lists?

YES

NO

3.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

If there is any risk in a new developed product, it never be outsourced

TRUE

FALSE

4.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

When the manufacturing processes are more integrated, the less indirect costs are reduced

TRUE

FALSE

5.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

Manufacturing processes should not be integrated as much as possible.

TRUE

FALSE

6.

MULTIPLE CHOICE QUESTION

10 sec • 5 pts

Is it acceptable to analyze suppliers' production lines to see if it is possible to create production bridges and make processes more flexible?

TRUE

FALSE

7.

FILL IN THE BLANK QUESTION

20 sec • 10 pts

It is important to think always about various ______ methods from

all aspects such as technology, production engineering development, logistics etc.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?