Handling Locked Parts Quiz

Handling Locked Parts Quiz

13 Qs

quiz-placeholder

Similar activities

Quiz FST September 2023

Quiz FST September 2023

KG - University

10 Qs

rtp

rtp

KG - University

11 Qs

ADPG 2nd TQMplus Symposium Game Session 2

ADPG 2nd TQMplus Symposium Game Session 2

KG - University

10 Qs

image compression

image compression

7th Grade

15 Qs

equivalent fractions

equivalent fractions

5th Grade

15 Qs

VGD TEST  EXCERCISE

VGD TEST EXCERCISE

KG - University

17 Qs

See how much you know

See how much you know

KG - University

15 Qs

Personal Shopper

Personal Shopper

KG - University

15 Qs

Handling Locked Parts Quiz

Handling Locked Parts Quiz

Assessment

Quiz

Hard

Created by

Amirul Muzammir

Used 3+ times

FREE Resource

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the document 'PP10 - Control of Non Conforming Parts Procedure'?

To describe the process for issuing Non-Conformance Orders from QA

To provide guidance on the process of Control of Non Conforming Parts at Assembly

To describe the functions and working procedure of bulk material handling with locked parts in Asymy

To describe the process for scrapping non-conforming Parts

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the defect is due to an incoming issue, what action should the Assembler take?

Send all the parts in the red bin to the Leader

Refill the parts from KAA workstation and place it in the small blue bin at the Assemble workstation

Write the details on a label and stick it to a plastic bag then put it in the red bin

Put the parts into the plastic bag and inform Quality Assurance to issue Non-Conformance Order and inform Supplier Quality Engineer

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the function of the red bin?

To hold parts that are related to sealing surfaces, function, tightness, or cleanliness before they are refilled

To hold parts that do not meet the quality requirements before they are scrapped

To hold parts that are incoming issues before they are inspected by QA

To hold parts that have been identified as hazardous before they are returned to the supplier

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should the QA or Production Manager do to scrap the physical parts?

Inform Supplier Quality Engineer to generate Scrap Approval and get approval from production manager

Put the parts into the plastic bag and inform Quality Assurance to issue Non-Conformance Order

Write the details on a label and stick it to plastic bag and put in the red bin

Refill the parts from KAA workstation and place it in the small blue bin at the assemble workstation

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the reject is due to assemblers handling error, which action should the assembler take?

Send all the parts in the red bin to Leader

Refill the parts from KAA workstation and place in the small blue bin at the assemble workstation

Put the part into the plastic bag and information Supplier Quality Engineer to generate Scrap Approval and get approval from production manager

Put the part into the plastic bag and write the details on a label and stick to plastic bag then put in the red bin

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are parts placed in the small blue bin at the assemble workstation?

Small parts such as screw, bolts, O-Rings and nuts

Defective parts that are due to an incoming issue

Parts that are related to sealing surfaces, function, tightness, or cleanliness

Parts that are identified as hazardous

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How often should the assembler send all the parts in the red bin to the Leader?

At the end of each day

At the end of each shift

Whenever QA or Production Manager generates Scrap Approval

At the start of each shift

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?