1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the document 'PP10 - Control of Non Conforming Parts Procedure'?

To describe the process for issuing Non-Conformance Orders from QA

To provide guidance on the process of Control of Non Conforming Parts at Assembly

To describe the functions and working procedure of bulk material handling with locked parts in Asymy

To describe the process for scrapping non-conforming Parts

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the defect is due to an incoming issue, what action should the Assembler take?

Send all the parts in the red bin to the Leader

Refill the parts from KAA workstation and place it in the small blue bin at the Assemble workstation

Write the details on a label and stick it to a plastic bag then put it in the red bin

Put the parts into the plastic bag and inform Quality Assurance to issue Non-Conformance Order and inform Supplier Quality Engineer

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the function of the red bin?

To hold parts that are related to sealing surfaces, function, tightness, or cleanliness before they are refilled

To hold parts that do not meet the quality requirements before they are scrapped

To hold parts that are incoming issues before they are inspected by QA

To hold parts that have been identified as hazardous before they are returned to the supplier

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should the QA or Production Manager do to scrap the physical parts?

Inform Supplier Quality Engineer to generate Scrap Approval and get approval from production manager

Put the parts into the plastic bag and inform Quality Assurance to issue Non-Conformance Order

Write the details on a label and stick it to plastic bag and put in the red bin

Refill the parts from KAA workstation and place it in the small blue bin at the assemble workstation

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the reject is due to assemblers handling error, which action should the assembler take?

Send all the parts in the red bin to Leader

Refill the parts from KAA workstation and place in the small blue bin at the assemble workstation

Put the part into the plastic bag and information Supplier Quality Engineer to generate Scrap Approval and get approval from production manager

Put the part into the plastic bag and write the details on a label and stick to plastic bag then put in the red bin

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are parts placed in the small blue bin at the assemble workstation?

Small parts such as screw, bolts, O-Rings and nuts

Defective parts that are due to an incoming issue

Parts that are related to sealing surfaces, function, tightness, or cleanliness

Parts that are identified as hazardous

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How often should the assembler send all the parts in the red bin to the Leader?

At the end of each day

At the end of each shift

Whenever QA or Production Manager generates Scrap Approval

At the start of each shift

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?