RISK-BASED INSPECTION (RBI)

RISK-BASED INSPECTION (RBI)

Professional Development

11 Qs

quiz-placeholder

Similar activities

MyPertamina Hero Goes To Mandalika 2023

MyPertamina Hero Goes To Mandalika 2023

Professional Development

10 Qs

Lixo Marinho

Lixo Marinho

Professional Development

15 Qs

Quiz BCMH Mobilku Week 2 (14/11/2020)

Quiz BCMH Mobilku Week 2 (14/11/2020)

Professional Development

15 Qs

MSDM.net Quiz 110

MSDM.net Quiz 110

Professional Development

10 Qs

Kuis BO Periode Januari 2023

Kuis BO Periode Januari 2023

Professional Development

10 Qs

Pretest Hari Kedua LKMM-TMxSK

Pretest Hari Kedua LKMM-TMxSK

Professional Development

10 Qs

Nakinig ka ba kahapon?

Nakinig ka ba kahapon?

Professional Development

15 Qs

Prevent 2019-20

Prevent 2019-20

Professional Development

11 Qs

RISK-BASED INSPECTION (RBI)

RISK-BASED INSPECTION (RBI)

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Medium

Created by

Nurul Izni Md Amin

Used 6+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

What is Risk Based Inspection?

The Risk-Based Inspection (RBI) methodology is used to manage the overall risk of a plant by focusing inspection efforts on the equipment with the highest risk

The Risk-Based Inspection (RBI) is software used for calculation of consequences of failure

The Risk-Based Inspection (RBI) methodology is used to manage the overall probabilities of failures of a plant by focusing mitigation efforts on the equipment with the highest risk

The Risk-Based Inspection (RBI) is a standard used to manage the overall risks of failures in a plant by focusing on the equipment in ALARP region

2.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Act vs Code/Standard? Which one should to comply?

Act is the highest authority to be complied, if the Act more stringent than standard, then should follow the Act/Regulation

Code/Standard is the highest authority to be complied, if the standard more stringent than act, then should follow the Code/Standard

3.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Which code / standard should be use during pre-construction & in service?

Pre-cons: API,

In service: ASME Sec I

Pre-cons: ASME Sec I, In service: API

Pre-cons: ASME PCC 2,

In service: API

4.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

How many types of RBI analysis/assessment?

2-Qualitative, Quantitative

2-Semi, Quantitative

3-Qualitative, Semi, Quantitative

5.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

What is factors to be considered in LOF/POF evaluation?

Health and Safety Impact

Human and operator errors

External condition

Earthquakes

6.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

What is factors to be considered in COF evaluation?

Human error

Natural disasters

External events

Environment, Business impact

7.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

How the process to implement RBI?

Data collection -> Damage mechanism identification -> Risk assessment -> Risk Ranking -> Mitigation -> Insp. Plan -> Reassessment

Data collection -> Damage mechanism identification -> Risk assessment -> Risk Ranking -> Insp. Plan -> Mitigation -> Reassessment

Data collection -> Risk assessment -> Risk Ranking -> Insp. Plan -> Damage mechanism identification-> Mitigation -> Reassessment

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?