RISK-BASED INSPECTION (RBI)

RISK-BASED INSPECTION (RBI)

Professional Development

11 Qs

quiz-placeholder

Similar activities

Govt. Initiatives

Govt. Initiatives

Professional Development

15 Qs

Fin World

Fin World

Professional Development

15 Qs

BSBWHS412

BSBWHS412

Professional Development

10 Qs

OSH Supervisor

OSH Supervisor

12th Grade - Professional Development

8 Qs

POM Retest Aug 7th

POM Retest Aug 7th

Professional Development

15 Qs

Tahu Nggak? -Edisi 26 Juli 2021-

Tahu Nggak? -Edisi 26 Juli 2021-

Professional Development

10 Qs

General Semester (A Beginning Level)

General Semester (A Beginning Level)

Professional Development

15 Qs

Central Banking Quiz

Central Banking Quiz

University - Professional Development

15 Qs

RISK-BASED INSPECTION (RBI)

RISK-BASED INSPECTION (RBI)

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Nurul Izni Md Amin

Used 6+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

What is Risk Based Inspection?

The Risk-Based Inspection (RBI) methodology is used to manage the overall risk of a plant by focusing inspection efforts on the equipment with the highest risk

The Risk-Based Inspection (RBI) is software used for calculation of consequences of failure

The Risk-Based Inspection (RBI) methodology is used to manage the overall probabilities of failures of a plant by focusing mitigation efforts on the equipment with the highest risk

The Risk-Based Inspection (RBI) is a standard used to manage the overall risks of failures in a plant by focusing on the equipment in ALARP region

2.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Act vs Code/Standard? Which one should to comply?

Act is the highest authority to be complied, if the Act more stringent than standard, then should follow the Act/Regulation

Code/Standard is the highest authority to be complied, if the standard more stringent than act, then should follow the Code/Standard

3.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Which code / standard should be use during pre-construction & in service?

Pre-cons: API,

In service: ASME Sec I

Pre-cons: ASME Sec I, In service: API

Pre-cons: ASME PCC 2,

In service: API

4.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

How many types of RBI analysis/assessment?

2-Qualitative, Quantitative

2-Semi, Quantitative

3-Qualitative, Semi, Quantitative

5.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

What is factors to be considered in LOF/POF evaluation?

Health and Safety Impact

Human and operator errors

External condition

Earthquakes

6.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

What is factors to be considered in COF evaluation?

Human error

Natural disasters

External events

Environment, Business impact

7.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

How the process to implement RBI?

Data collection -> Damage mechanism identification -> Risk assessment -> Risk Ranking -> Mitigation -> Insp. Plan -> Reassessment

Data collection -> Damage mechanism identification -> Risk assessment -> Risk Ranking -> Insp. Plan -> Mitigation -> Reassessment

Data collection -> Risk assessment -> Risk Ranking -> Insp. Plan -> Damage mechanism identification-> Mitigation -> Reassessment

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?