Object Migration Assessment Quiz 1

Object Migration Assessment Quiz 1

Professional Development

10 Qs

quiz-placeholder

Similar activities

QUESTIONARIO SOBRE SERVIÇOS DO SISTEMA OPERACIONAL

QUESTIONARIO SOBRE SERVIÇOS DO SISTEMA OPERACIONAL

Professional Development

14 Qs

IT ENGLISH: Research Project Topics - Database Administration

IT ENGLISH: Research Project Topics - Database Administration

Professional Development

10 Qs

PHP QUIZ-2

PHP QUIZ-2

Professional Development

10 Qs

[Basic] Laravel quiz

[Basic] Laravel quiz

Professional Development

15 Qs

PCSSA Review - Deployments

PCSSA Review - Deployments

Professional Development

13 Qs

HTML Basics

HTML Basics

Professional Development

15 Qs

PHP Tours Meetup #20 Café & Migration de données

PHP Tours Meetup #20 Café & Migration de données

University - Professional Development

11 Qs

Basic CSS

Basic CSS

Professional Development

15 Qs

Object Migration Assessment Quiz 1

Object Migration Assessment Quiz 1

Assessment

Quiz

Computers

Professional Development

Hard

Created by

sapan kumar

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the sequence of Native Transformation Migration?

Configuration > Pre-Check > Enumeration > Switch Over Application > Indexing > Migration > Reconciliation

Configuration > Pre-Check > Switch Over Application > Enumeration > Indexing > Migration > Reconciliation

Configuration > Pre-Check > Switch Over Application > Indexing > Enumeration > Migration > Reconciliation

Configuration > Pre-Check > Enumeration > Switch Over Application > Indexing > Migration > Reconciliation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the equivalent of Centera cluster on ECS?

Storage Pool

VDC

Namespace

Bucket

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the order of successful ECSSync migration flow?

Read from Source > Write to Target > Read from Target > Object complete

Read from Source > Write to Target > Retry queue > Object complete

Read from Source > Write to Target > Error > Object complete

Read from Source > Write to Target > Retry queue > Write to Target > Object complete

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which migration methodology is best suited for Centera CAS protocol conversion to ECS S3 API?

ECSSync

Native Transformation

DobiMiner

Interlock

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of the following statement(s) would be considered invalid for Tech Refresh Migration

Data is copied through ECS backend network

A subset of data cannot be moved

Tech refresh logically removes the endpoints and nodes from the storage pool at the end

Multiple racks in a VDC must be tech refreshed individually

Source nodes are black listed prior to the data evacuation

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which firewall port is required for ECSSync migration?

3218 TCP or UDP: Outbound from ECSSync to Centera & Outbound from ECSSync to ECS

3218 TCP and UDP: Outbound from Centera to ECSSync & Outbound from ECS to ECSSync

3218 TCP and UDP: Outbound from ECSSync to Centera & Outbound from ECSSync to ECS

3218 TCP or UDP: Outbound from Centera to ECSSync & Outbound from ECS to ECSSync

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Centera is enabled with Content Protection Mirror (CPM) and CAS application is ingesting small blobs. Overall capacity utilization report shows 400Million objects. Which of the following statements is true for ECSSync migration design?

Clips to migrate is 100M, deploy at least 2 sync servers to run parallel jobs

Clips to migrate is 200M, deploy at least 2 sync servers to run parallel jobs

Clips to migrate is 300M, deploy at least 2 sync servers to run parallel jobs

Clips to migrate is 400M, deploy at least 2 sync servers to run parallel jobs

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?