The full form of PERT is
Program Evaluation and Rate Technology
Program Evaluation and Robot Technique
Program Evaluation and Review Technique
Program Evaluation and Robot Technology
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The full form of CPM is
Critical Path Method
Critical Plan Management
Control Path Method
Control Path Management
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A PERT network is activity-oriented while a CPM network is event-oriented.
True
False
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The difference between the maximum time available and the actual time needed to perform an activity is known as
Free float
Total float
Independent float
Half float
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A set of values of decision variables that satisfies the linear constraints and non-negativity conditions of an L.P.P. is called its:
Unbounded solution
Optimum solution
Feasible solution
None of these
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a type of Linear programming problem?
Manufacturing problem
Diet problem
Transportation problems
All of the above
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The objective function of a linear programming problem is:
a constraint
function to be optimised
None of these
A relation between the variables
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?