1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What SPP Document is the new Methods of Compensation and Schedule of Fees?
210
209
208-B
310
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the Method of Compensation best used for an initial proposal wherein no set specifications are made-only the project type and the area?
PFPE
Unit Cost Method
PPCC
Retainer
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the best Method of Compensation applicable for work that requires the Architect's personal time, such as seminars, oculars, trainings, and the like?
Unit Cost Method
PPCC
Lump Sum
Per Diem
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the best Method of Compensation for when the project has cost and time constraints that are difficult to determine on the onset of the project?
PPCC
Lump Sum
Salary Cost x Multiplier
Retainer
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the prescribed multiplier factor for salary cost x multiplier?
1.5 to 2.5
3.0
4.5
5.0
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following shall not be preferably billed via a Per Diem compensation?
OSH Seminar Attendance
One-Time Client Consultation
Repeated use of an already built project
Site inspection for a probable building location
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
To whom are the mobilization and operational costs billable to?
Architect
Client
Technical Staff
Government
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?