Search Header Logo

Central Heating Quiz phase 2 LO1.4/1

Authored by Daniel Edwards

Science

Professional Development

Used 7+ times

Central Heating Quiz phase 2 LO1.4/1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What do Thermostatic Radiator Valves react to?

Water temperature

Air temperature

Pressure

Flow rate

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where should an automatic air valve be placed on a system?

At low points

At high points

At the boiler

At the radiator

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why must temporary filling loops be removed after filling a heating system?

To prevent leaks

To prevent airlocks

To prevent cross-connection

To prevent overheating

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should F&E cisterns be properly sized?

To save space

To improve water quality

To accommodate water expansion

To reduce installation cost

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What head of pressure is sufficient for domestic central heating circulating pumps?

2m to 4m

4m to 6m

6m to 8m

8m to 10m

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where should a Thermo-mechanical cylinder control valve be fitted on the heating system primary circuit?

On the flow pipe

On the return pipe

On the expansion pipe

On the boiler pipe

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why do we use inhibitor in a central heating system?

To increase water pressure

To prevent corrosion

To improve heat transfer

To reduce noise

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?