1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Delores is leading a marketing project. She meets with the stakeholders to define and document all the needs for the marketing project. The activity that Delores is participating in is referred to as:
collecting requirements
controlling the scope
creating the WBS
verifying the scope.
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Kristi is in charge of planning a charity event for the hospital. She wants to review the requirements of each of the stakeholders. Kristi should be reviewing which document?
requirements documen
requirements management plan
requirements traceability matrix
work breakdown structure
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Jackie is developing a document that will outline the methods to create and manage requirements, as well as the method used to prioritize requirements. Jackie is working on the:
requirements documentation
requirements management plan.
requirements traceability matrix
work breakdown structure
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Sam is an event planner and is considering locations for an annual conference. He has decided to ask the board of directors to vote on two locations, so that whichever location receives over 50% of the group's support will win. Sam is using which technique to collect requirements?
dictatorship
majority
plurality
unanimity
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Peter is working on a respiration project for firefighters. Before finalizing the product requirements, he would like to show a working model to the firefighters at the local station to gather feedback. The technique that Peter should use to test the working model would be a/an:
facilitated workshop
observation
prototype
survey
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Carol is managing a construction project and is considering relocating her team closer to the project construction worksite. She asks the stakeholders to vote on this decision and will make the move only if they all agree to it. Carol is using which tool or technique to collect requirements?
dictatorship
majority
plurality.
unanimity
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Kacie is working on a new car design for an automotive company. She is currently working on a way to analyze, document, and manage all the stakeholder requirements for the new design. Kacie is working on the:
requirements management plan
requirements documentation
requirements traceability matrix
work breakdown structure
Create a free account and access millions of resources
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
39 questions
Unit 20 (Firms) (IGCSE)
Quiz
•
10th Grade - University
40 questions
Administrasi Umum PM
Quiz
•
12th Grade
41 questions
Basic Economic Concepts
Quiz
•
9th Grade
41 questions
JSC, Cooperative society and Public Sector
Quiz
•
9th Grade
47 questions
Entrepreneurship UNIT 2-3-4 Review
Quiz
•
10th Grade
47 questions
Business letter review
Quiz
•
11th - 12th Grade
44 questions
Business Finance Terms
Quiz
•
12th Grade
40 questions
Venture: Entrepreneurial Expedition Lesson 1&2
Quiz
•
9th - 12th Grade
Popular Resources on Wayground
5 questions
This is not a...winter edition (Drawing game)
Quiz
•
1st - 5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
10 questions
Identify Iconic Christmas Movie Scenes
Interactive video
•
6th - 10th Grade
20 questions
Christmas Trivia
Quiz
•
6th - 8th Grade
18 questions
Kids Christmas Trivia
Quiz
•
KG - 5th Grade
11 questions
How well do you know your Christmas Characters?
Lesson
•
3rd Grade
14 questions
Christmas Trivia
Quiz
•
5th Grade
20 questions
How the Grinch Stole Christmas
Quiz
•
5th Grade