Sanitation Systems phase 2 1.5

Sanitation Systems phase 2 1.5

Professional Development

13 Qs

quiz-placeholder

Similar activities

1995 CSI Masterformat - 03

1995 CSI Masterformat - 03

7th Grade - Professional Development

16 Qs

1995 CSI Masterformat - 01

1995 CSI Masterformat - 01

7th Grade - Professional Development

16 Qs

Building Regulations and Central Heating Systems Quiz

Building Regulations and Central Heating Systems Quiz

Professional Development

8 Qs

JPT - BP344 QUIZ 1

JPT - BP344 QUIZ 1

Professional Development

15 Qs

Cold Water Systems Quiz l2 2.7 LO

Cold Water Systems Quiz l2 2.7 LO

Professional Development

10 Qs

LARO 21: Synergy - Theory of Architecture

LARO 21: Synergy - Theory of Architecture

Professional Development

10 Qs

Building Materials

Building Materials

10th Grade - Professional Development

15 Qs

ALE TOA - part 1

ALE TOA - part 1

Professional Development

15 Qs

Sanitation Systems phase 2 1.5

Sanitation Systems phase 2 1.5

Assessment

Quiz

Architecture

Professional Development

Medium

Created by

Daniel Edwards

Used 5+ times

FREE Resource

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to position waste pipe systems and soil pipe systems with care inside buildings?

To improve the aesthetics of the building

To save money on materials

To prevent damage to the building fabric

To make it easier to install the pipes

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens if notching of joists is done when the pipe is greater in diameter than 1/8 of the joist depth?

The joist strength will be severely compromised

The joist will become stronger

The pipe will be easier to install

The pipe will become unstable

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Can waste pipe systems and soil pipe systems be positioned across the joist run?

Yes, it is the recommended positioning

No, it is not recommended

It doesn't matter

Only if the pipes are small in diameter

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum diameter of the pipe that can be notched into a joist?

1/8 of the joist depth

1/2 of the joist depth

The full joist depth

1/4 of the joist depth

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of positioning pipes with the joist run?

To improve the aesthetics of the building

To save money on materials

To prevent damage to the building fabric

To make it easier to install the pipes

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why are waste pipe systems and soil pipe systems difficult to position under floors?

Because they are fragile

Because they require large pipe sizes

Because they are heavy

Because they are expensive

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should NOT be done when positioning waste pipe systems and soil pipe systems?

Positioning them across the joist run

Positioning them with the joist run

Notching of joists

Positioning them under floors

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?