Cold Water Systems Quiz L3p2U5,2.5:1

Cold Water Systems Quiz L3p2U5,2.5:1

Professional Development

10 Qs

quiz-placeholder

Similar activities

Chapter 2.- Engine construction

Chapter 2.- Engine construction

Professional Development

8 Qs

Phase4.mod13.chimney test

Phase4.mod13.chimney test

Professional Development

7 Qs

Aircraft Power Plant - Turbine

Aircraft Power Plant - Turbine

University - Professional Development

11 Qs

thermal engineering II

thermal engineering II

Professional Development

10 Qs

Plumbing and Water Treatment Quiz

Plumbing and Water Treatment Quiz

Professional Development

13 Qs

Fluid Machinery Quiz 2 (Reaction Turbine)

Fluid Machinery Quiz 2 (Reaction Turbine)

Professional Development

15 Qs

Cold Water Systems Quiz L2 2.4 Part5 LO

Cold Water Systems Quiz L2 2.4 Part5 LO

Professional Development

10 Qs

Cold Water Systems Quiz L3P2U5,2.4:8

Cold Water Systems Quiz L3P2U5,2.4:8

Professional Development

10 Qs

Cold Water Systems Quiz L3p2U5,2.5:1

Cold Water Systems Quiz L3p2U5,2.5:1

Assessment

Quiz

Science

Professional Development

Hard

Created by

Craig Boothright

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of an effective inlet control device in a cistern?

To maintain the correct water level

To prevent contamination

To provide insulation against freezing

To allow for maintenance and repair activities

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be included in a cistern to prevent stagnation?

An arrangement of pipework to allow water circulation

Insulation against freezing or undue warming

Service valves on inlet and outlet pipework connections

Screened warning/overflow pipes

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should cisterns be positioned over a load bearing wall?

To eliminate the risk of leaks

To spread the load across the roof trusses

To allow for maintenance and cleaning

To prevent contamination

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum access requirement for cleaning and maintenance of cisterns?

150mm above the cistern

350mm above the cistern

1000mm above the cistern

500mm above the cistern

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of float operated valve should be fitted in a cistern?

BS1212 Part 1

BS1212 Part 4

BS1212 Part 2

BS1212 Part 3

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should the cold distribution pipe be taken from the bottom of the cistern?

To prevent sediment build up

To ensure rapid turnover of water

To prevent scalding

To allow for adjustment of water level

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where should the highest outlet be fitted in a cistern with two outlets?

On the opposite side to the inlet connection

On the same side as the inlet connection

On the opposite side to the float operated valve

On the same side as the float operated valve

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?