Chapter 6

Chapter 6

7 Qs

quiz-placeholder

Similar activities

Data Governance Quiz

Data Governance Quiz

KG - University

12 Qs

Aluminum,, gold, and copper matter and its properties

Aluminum,, gold, and copper matter and its properties

8th Grade

10 Qs

Manufacturing Kaizen Forum Quiz Challenge for Technical Training

Manufacturing Kaizen Forum Quiz Challenge for Technical Training

KG - University

6 Qs

Kelsey Quiz

Kelsey Quiz

KG - University

8 Qs

SHAZE for M.E.S Program

SHAZE for M.E.S Program

KG - University

10 Qs

Temperature and Humidity

Temperature and Humidity

KG - University

10 Qs

2023 Virtual Christmas Trivia

2023 Virtual Christmas Trivia

KG - University

10 Qs

GAME 1

GAME 1

KG - University

10 Qs

Chapter 6

Chapter 6

Assessment

Quiz

Medium

Created by

Vera Cholasta

Used 1+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which tools help to support static testing?

 Static analysis tools and test execution tools.

Review process support tools, static analysis tools and coverage measurement tools.

Dynamic analysis tools and modeling tools.

Review process support tools, static analysis tools and modeling tools.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which test activities are supported by test harness or unit test framework tools? 

Test management and control.

Test specification and design.

Test execution and logging.

 Performance and monitoring. 

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the potential benefits from using tools in general to support testing?

Greater quality of code, reduction in the number of testers needed, better objectives for testing.

Greater repeatability of tests, reduction in repetitive work, objective assessment.

Greater responsiveness of users, reduction of tests run, objectives not necessary.

Greater quality of code, reduction in paperwork, fewer objections to the tests.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a potential risk in using tools to support testing?

Unrealistic expectations, expecting the tool to do too much.

Insufficient reliance on the tool, i.e. still doing manual testing when a test execution tool has been purchased.

The tool may find defects that aren't there.

The tool will repeat exactly the same thing it did the previous time.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following are advanced scripting techniques for test execution tools?

Data-driven and keyword-driven

Data-driven and capture-driven

Capture-driven and keyhole-driven

Playback-driven and keyword-driven

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following would NOT be done as part of selecting a tool for an organization?

Assess organizational maturity, strengths and weaknesses.

Roll out the tool to as many users as possible within the organization.

Evaluate the tool features against clear requirements and objective criteria.

Identify internal requirements for coaching and mentoring in the use of the tool.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a goal for a proof-of-concept or pilot phase for tool evaluation?

Decide which tool to acquire.

Decide on the main objectives and requirements for this type of tool.

Evaluate the tool vendor including training, support and commercial aspects.

Decide on standard ways of using, managing, storing and maintaining the tool and the test assets.