Module 4 (PART 2) Energy Isolation Certificate Quiz

Module 4 (PART 2) Energy Isolation Certificate Quiz

12th Grade

9 Qs

quiz-placeholder

Similar activities

Polarity of Molecules W3 M3 D

Polarity of Molecules W3 M3 D

12th Grade

10 Qs

Linh kiện bán dẫn và IC

Linh kiện bán dẫn và IC

12th Grade

10 Qs

555 timer quiz

555 timer quiz

9th - 12th Grade

8 Qs

Ch 18- Evolution and Genes

Ch 18- Evolution and Genes

9th - 12th Grade

12 Qs

Meiosis Review

Meiosis Review

9th - 12th Grade

12 Qs

QUIZ 2 W 1&2 Q1 (GenBio2)

QUIZ 2 W 1&2 Q1 (GenBio2)

12th Grade

14 Qs

HEREDITARIEDADE - 9º ANO

HEREDITARIEDADE - 9º ANO

1st - 12th Grade

14 Qs

Module 4: (EXTRA) Energy Isolation and Safe Work Practices

Module 4: (EXTRA) Energy Isolation and Safe Work Practices

12th Grade

9 Qs

Module 4 (PART 2) Energy Isolation Certificate Quiz

Module 4 (PART 2) Energy Isolation Certificate Quiz

Assessment

Quiz

Science

12th Grade

Hard

Created by

Christopher Blake

Used 27+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the Energy Isolation Certificate (IC)?

Record work completion

Ensure safe work practices and communication

Update plant integrity

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is responsible for completing the Application Section of the Energy Isolation Certificate (IC)?

Area Authority (AA)

Isolating Operator (ISO)

Asset Owner

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is a Sanction To Test (STT) required?

At the end of the work shift

During pre-start ups

After permit expiration

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the Isolation Authority (ISA) confirm in the Mechanical Isolation Details?

Work scope details

De-isolation sequence

Integrity of isolations

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who approves the de-isolation of equipment in the Electrical Energy Isolation Certificate?

Isolating Operator (ISO)

Area Authority (AA)

Permit Issuer (PI)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When should the Isolating Operator (ISO) sign off on the Isolation Certificate (IC) during the de-isolation process?

Before the independent verification

After the closure by Area Authority (AA)

Before the approval by AA

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who determines whether an independent verification is required for isolation points?

Isolating Operator (ISO)

Area Authority (AA)

Permit Issuer (PI)

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the Dynamic Risk Assessment process?

Confirm isolations

Monitor hazards and assess risks

Update the Isolation Certificate

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum acceptable standard of final isolation for intrusive and non-intrusive maintenance?

Maximum Isolation Standard

Baseline Isolation Standard

Advanced Isolation Standard