API 578 quiz 1

API 578 quiz 1

8th Grade

15 Qs

quiz-placeholder

Similar activities

Project mc²

Project mc²

2nd Grade - Professional Development

11 Qs

Olympic 2020

Olympic 2020

7th - 9th Grade

10 Qs

GRYFFINDOR

GRYFFINDOR

1st - 10th Grade

10 Qs

minecraft

minecraft

KG - Professional Development

17 Qs

Past Continuous

Past Continuous

4th - 9th Grade

10 Qs

Day 2

Day 2

KG - 12th Grade

20 Qs

Friends Trivia Game Night: Where

Friends Trivia Game Night: Where

5th Grade - Professional Development

10 Qs

Mortal Engines

Mortal Engines

7th - 12th Grade

20 Qs

API 578 quiz 1

API 578 quiz 1

Assessment

Quiz

Fun

8th Grade

Practice Problem

Hard

Created by

nns s nsbs

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An inspection lot includes:




all materials from a common source.

all materials included on the same purchase order.

all materials of the same material type (i.e. 316 SS).

all materials from a common source, of the same material type and
same heat.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not needed on a MTR?


Date of production & testing

Source of ore & % of recycled materials

Chemical specifications

Physical specifications

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Incorrect substitution of carbon steel is most likely to be found in:




any ferritic equipment.

any non-ferrous equipment.

chrome equipment.

stainless equipment.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which residual element in a carbon steel has not caused increased corrosion
rates in HF acid piping system?

C

Cr

Cu

Ni

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Carbon steel can corrode rapidly in hydrogen-free sulfidation conditions
when the silicon content in carbon steel is:




< 0.10%.

> 0.10%.

< 0.25%.

> 0.25%.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During construction, the Owner should consider 100% PMI of new
components on:




all pressure equipment.

all alloys above P-5.

exotic alloys.

high-risk pressure equipment.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Due to the higher potential for material handling mistakes, a higher degree
of PMI should be conducted on materials supplied by:




European materials manufacturers.

manufacturers of materials.

stocking distributors.

warehouse of owner/user.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?