Cold Water Systems LO2
Authored by George Harding
Professional Development
Professional Development
Used 646+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
13 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When installing an incoming mains, the pipe should be laid between:
500mm and 1200mm
800mm and 1500mm
750mm and 1350mm
1000mm and 2000mm
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What colour is MDPE?
Black
Blue
Red
Yellow
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum size pipe modern properties are supplied with?
15mm
22mm
25mm
28mm
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
At which point on a cold water supply system is regulated under the Water Regulations?
From the ferrule
From the water treatment plant
From the Boundary stop valve
From the stop valve inside the property
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
All meters must be installed in a chamber located at the boundary of the property.
True
False
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Due to MDPE degrading in sunlight, what is the maximum permitted length you can install above the finish floor level?
400mm
275mm
200mm
150mm
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In accordance with the Water Regulations, where should the stop valve be located?
Inside the building, below floor level, as close as possible to the door
Inside the airing cupboard, as close as possible to the door
Outside the building, as close as possible to the property boundary
Inside the building, above floor level, as close as possible to the point of entry
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?