Rainwater Systems QuizL3P2U,4.3/4.4

Rainwater Systems QuizL3P2U,4.3/4.4

Professional Development

10 Qs

quiz-placeholder

Similar activities

Windows

Windows

7th Grade - Professional Development

14 Qs

Communication Methods in Construction PT2

Communication Methods in Construction PT2

Professional Development

10 Qs

Persistency Quiz

Persistency Quiz

Professional Development

12 Qs

Construction Careers Quiz

Construction Careers Quiz

Professional Development

10 Qs

Ph1 CPT bolts and fixings

Ph1 CPT bolts and fixings

Professional Development

10 Qs

Building Tech

Building Tech

Professional Development

10 Qs

Rainwater Systems QuizL3P2U8,4.2

Rainwater Systems QuizL3P2U8,4.2

Professional Development

7 Qs

Rainwater Systems QuizL3P2U8,1.6

Rainwater Systems QuizL3P2U8,1.6

Professional Development

15 Qs

Rainwater Systems QuizL3P2U,4.3/4.4

Rainwater Systems QuizL3P2U,4.3/4.4

Assessment

Quiz

Architecture

Professional Development

Hard

Created by

Craig Boothright

Used 3+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done before testing takes place?

Notify the customer

Start testing immediately

Move customer property to a safe location

Ignore the customer

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where should the water be discharged during testing?

Directly into the gutters

In the rainwater pipes

On to the roof tiles at the gutters highest point(s)

On the ground

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be checked during operational checks?

Pooling inside the gutter

Joint leakage

All of the above

Fast flow of water

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does a fast flow of water indicate during operational checks?

None of the above

Correct fall of the gutter

Incorrect fall of the gutter

Leakage in the rainwater pipes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where should the water be discharged from the rainwater pipes during operational checks?

In the correct location

In the gutters

On the roof tiles

On the ground

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done if there is personal customer property that may cause a hindrance to the testing and commissioning procedures?

Stop testing

Continue testing without notifying the customer

Ignore it

Ask the customer to move it to a safe location

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be visually checked during operational checks?

The size of the rainwater pipes

The material of the gutters

The flow of water

The color of the water

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?