10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The team that is responsible for winning project awards is called:
Bid-Estimating
VDC
Con-Estimating
Design Assist Team
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In the Design Assist process, you can see all 3 stage documents in what application?
The Hub
QC Apex
BPM
PSN
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT one of the responsibilities of the VDC PM at the start of the project?
Research the project in BPM
Upload the electrical drawings into Fieldwire
Request the Revit Model and Temp. Power Survey from the Ops PM
Request to be added the Fieldwire project, QC Apex and Time Coding for the project
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT a purpose of the Staging Report?
Track labor hours
Forecast the Coordination Budget
Create Deliverable Due Dates
View who is coding time to your project
5.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
True or False: Internal QC Due date is the date that represents when the installation drawings should be QCed by the Superintendent
True
True
False
False
6.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
True or False: Touchpoint dates are input into the Staging Report
True
True
False
False
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The meeting in which the entire project team for get together to discuss and establish project milestones is the Hub is called:
Project Plan Meeting
Executive Strategy Meeting
VDC Internal Kick Off Meeting
Clash Meetings
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?