Quiz SPM 7

Quiz SPM 7

University

49 Qs

quiz-placeholder

Similar activities

s.e-unit-1-mcq

s.e-unit-1-mcq

University

45 Qs

ELECTIVE 2 - PRE-FINAL/FINAL EXAM

ELECTIVE 2 - PRE-FINAL/FINAL EXAM

University

45 Qs

9628-09 City & Guilds Level 3 Award in Coding and Logic Quiz 3

9628-09 City & Guilds Level 3 Award in Coding and Logic Quiz 3

11th Grade - Professional Development

50 Qs

System Analysis and Design (Prelim Exam)

System Analysis and Design (Prelim Exam)

University

53 Qs

Final Exam - Ent Sys

Final Exam - Ent Sys

University

50 Qs

Prelim Exam - Ent. Sys

Prelim Exam - Ent. Sys

University

50 Qs

Software engineering MCQ Test 1

Software engineering MCQ Test 1

University

50 Qs

Midterm Examination

Midterm Examination

University

50 Qs

Quiz SPM 7

Quiz SPM 7

Assessment

Quiz

Computers

University

Medium

Created by

Shiroi Kitsunee

Used 15+ times

FREE Resource

49 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt


The first reverse engineering activity involves seeking to understand

business trends

user interface

processing

data

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not considered one of the four important elements that should exist when a configuration management system is developed?

human elements

component elements

process elements

validation elements

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following tasks is not part of software configuration management?

version control

statistical quality control

change control

  1. reporting

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Software safety is a quality assurance activity that focuses on hazards that

prevent profitable marketing of the final product

affect the reliability of a software component

may result from user input errors

  1. may cause an entire system to fail

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A review summary report answers which three questions?

  1. what defects were found, what caused defects, who was responsible

  1. terminate project, replace producer, request a time extension

  1. project situation, success story, improvement point

  1. what was reviewed, who reviewed it, what were the findings

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Software reliability problems can almost always be traced to

  1. errors in operation

  1. errors in design

  1. errors in accuracy

  1. errors in requirements

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not ISO 9126 software quality factors?

Portability

Functionality

Reliability

Security

Answer explanation

Factors of ISO 9126: functionality, portability, reliability

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?