CDM 2015 Regulations Quiz

CDM 2015 Regulations Quiz

10 Qs

quiz-placeholder

Similar activities

PD&E Quiz 1

PD&E Quiz 1

University

10 Qs

Town Planning Permit Quiz

Town Planning Permit Quiz

University

15 Qs

Rainwater Systems Quiz phase2 lo8

Rainwater Systems Quiz phase2 lo8

Professional Development

8 Qs

Health and Safety Regulations Quiz

Health and Safety Regulations Quiz

11th Grade

14 Qs

Construction Phase Plan

Construction Phase Plan

12th Grade

10 Qs

Building Code & Blueprint Symbols

Building Code & Blueprint Symbols

7th Grade

9 Qs

CST 150: Electrical Drawings

CST 150: Electrical Drawings

University

10 Qs

Power Tools

Power Tools

12th Grade

14 Qs

CDM 2015 Regulations Quiz

CDM 2015 Regulations Quiz

Assessment

Quiz

Architecture

Medium

Created by

Richard Bolton

Used 4+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When were the CDM Regulations first introduced?

1994

2007

2015

1992

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the reason for the latest revision of the CDM Regulations in 2015?

To reduce safety standards

To increase bureaucratic processes

To simplify the regulations

To remove the role of principal designer

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the principal designer under the CDM 2015 Regulations?

Managing the construction phase

Preparing the health and safety file

Ensuring cooperation and coordination

Planning, managing and monitoring the pre-construction phase

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who are the duty holders under the CDM 2015 Regulations?

Clients, designers, and contractors

Clients, principal contractors, and workers

Designers, principal contractors, and workers

Clients, designers, and principal contractors

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the threshold for notifying the HSE about construction works under the CDM 2015 Regulations?

More than 10 workers working simultaneously

More than 30 working days and 20 workers working simultaneously

More than 50 person days

More than 100 working days

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What did a survey published in May 2017 suggest about the impact of CDM 2015?

Smaller projects and domestic clients were effectively brought into scope

The principles were taking root effectively

Fees and costs had decreased

A workable system had been made less workable

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the Construction (Design and Management) Regulations (CDM Regulations)?

To bypass safety standards during construction

To reduce the risk of harm to those who have to build, use and maintain structures

To increase the risk of harm to those who have to build, use and maintain structures

To ensure that health and safety issues are not considered during a project's development

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?