1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When were the CDM Regulations first introduced?
1994
2007
2015
1992
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the reason for the latest revision of the CDM Regulations in 2015?
To reduce safety standards
To increase bureaucratic processes
To simplify the regulations
To remove the role of principal designer
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the role of the principal designer under the CDM 2015 Regulations?
Managing the construction phase
Preparing the health and safety file
Ensuring cooperation and coordination
Planning, managing and monitoring the pre-construction phase
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who are the duty holders under the CDM 2015 Regulations?
Clients, designers, and contractors
Clients, principal contractors, and workers
Designers, principal contractors, and workers
Clients, designers, and principal contractors
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the threshold for notifying the HSE about construction works under the CDM 2015 Regulations?
More than 10 workers working simultaneously
More than 30 working days and 20 workers working simultaneously
More than 50 person days
More than 100 working days
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What did a survey published in May 2017 suggest about the impact of CDM 2015?
Smaller projects and domestic clients were effectively brought into scope
The principles were taking root effectively
Fees and costs had decreased
A workable system had been made less workable
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the role of the Construction (Design and Management) Regulations (CDM Regulations)?
To bypass safety standards during construction
To reduce the risk of harm to those who have to build, use and maintain structures
To increase the risk of harm to those who have to build, use and maintain structures
To ensure that health and safety issues are not considered during a project's development
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?