What is the main purpose of the Feed and Expansion (F&E) cistern in an open vented system?

6035CHPPT2Q1

Quiz
•

William Heron
•
Physics
•
12th Grade
•
Hard
16 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To provide a safety outlet in case of system overheating
To allow the heated water to expand and operate at atmospheric pressure
To separate air from the system and reduce noise
To discharge pressure to a safe location if required
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the function of the open vent pipe in a heating system?
To discharge pressure to a safe location if required
To separate air from the system and reduce noise
To allow the air to escape from the system while filling with water and in operation
To provide a safety outlet in case of system overheating
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of the sealed expansion vessel in a sealed system?
To replace the feed and expansion cistern of the open system
To provide a safety outlet in case of system overheating
To allow the heated water to expand and operate at atmospheric pressure
To separate air from the system and reduce noise
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum pipe size for the open vent pipe in a heating system?
22mm
20mm
18mm
15mm
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of the float operated valve (FOV) in the Feed and Expansion (F&E) cistern?
To allow the heated water to expand and operate at atmospheric pressure
To separate air from the system and reduce noise
To set the water level in the cistern to allow for expansion
To provide a safety outlet in case of system overheating
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is this?
I haven't a Scooby
A thermostatic radiator valve
An automatic bypass
A pipe thermostat
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is this?
A flexible tap connector
A pipe slinky
A filling loop
A flexible pipe tap in
8.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of the air separator in a heating system?
To replace the feed and expansion cistern of the open system
To provide a safety outlet in case of system overheating
To allow the heated water to expand and operate at atmospheric pressure
To allow for the correct installation of cold feed and open vent and separate air from the system and reduce noise
9.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are these?
Pump flanges
Bath tap isolators
Service valves for FOVs
Gate valves
10.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the correct layout for the vent and cold feed in an H frame configuration?
On the return to the boiler, on the discharge side of the circulator, with a minimum of 150mm between them
On the flow from the boiler, on the suction side of the circulator, with a maximum of 150mm between them
Flow from the boiler, open vent, 150mm cold feed, circulating pump.
On the return to the boiler, on the suction side of the circulator, with a maximum of 150mm between them
Explore all questions with a free account
Similar Resources on Quizizz
21 questions
9189CHPH2PPT1

Quiz
•
12th Grade
15 questions
9189PH1CHPPT2Q1

Quiz
•
12th Grade
20 questions
Le son

Quiz
•
KG - University
15 questions
9189PH2CHPPT6

Quiz
•
12th Grade
15 questions
9189PH1CHPPT2Q2

Quiz
•
12th Grade
19 questions
9189PH2CHPPT7

Quiz
•
12th Grade
18 questions
6035CHPPT2Q2

Quiz
•
12th Grade
15 questions
6035CHPPT2Q4

Quiz
•
12th Grade
Popular Resources on Quizizz
17 questions
CAASPP Math Practice 3rd

Quiz
•
3rd Grade
20 questions
math review

Quiz
•
4th Grade
21 questions
6th Grade Math CAASPP Practice

Quiz
•
6th Grade
13 questions
Cinco de mayo

Interactive video
•
6th - 8th Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
10 questions
4th Grade Math CAASPP (part 1)

Quiz
•
4th Grade
45 questions
5th Grade CAASPP Math Review

Quiz
•
5th Grade