6035 Hot Water LO1

6035 Hot Water LO1

Professional Development

13 Qs

quiz-placeholder

Similar activities

Vitamin C 2024

Vitamin C 2024

Professional Development

10 Qs

Business Writing 4

Business Writing 4

Professional Development

10 Qs

Cycle 4: Session 8 Review.

Cycle 4: Session 8 Review.

Professional Development

12 Qs

U 9-10 Summit 1 Review

U 9-10 Summit 1 Review

Professional Development

12 Qs

SBP

SBP

Professional Development

18 Qs

ITE2

ITE2

Professional Development

10 Qs

MFS backend

MFS backend

Professional Development

10 Qs

Pre Test Design Thinking

Pre Test Design Thinking

University - Professional Development

14 Qs

6035 Hot Water LO1

6035 Hot Water LO1

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Medium

Created by

George Harding

Used 350+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which act governs the codes of practice for hot and cold water services?

WRAS

BS6700

BS8000

BS1212

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Define: Instantaneous hot water.

Uses a hot water cylinder, which is heated by a boiler and distributes the hot water.

Uses a CWSC, which distributes the hot water via the cold feed pipe.

Uses a combination boiler, which heats water on demand and distributes the hot water.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Identify: Open vented, indirect gravity fed system.

Media Image
Media Image
Media Image
Media Image

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Identify: Direct hot water cylinder via a boiler.

Media Image
Media Image
Media Image
Media Image

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Statement: BS6700 recommend that the capacity of the CWSC should be at least the same capacity as the cylinder.

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To prevent parasitic circulation, how long should the pipe from the cylinder be before the connection to the vent pipe is made?

150mm

200mm

450mm

1000mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

BS6700 states that which valve should be installed on the vent pipe?

Fullway gate valve

Stop valve

Spherical plug valve

No valve

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development