TOPIC 1- COST PLANNING
Authored by Bintulhuda Z
Other
University
Used 18+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
DEFINITION OF COST PLANNING ?
Process of thinking about
activities / technique /
methods in controlling the
cost of a project so that it
will not exceed the
preliminary estimate at the
design stage
Process of thinking about
activities, technique,
methods in controlling the
cost of a project so that it
will not exceed the
preliminary estimate at the
construction stage
a
symbolic process thinking
representation of the
possible cost incurred
for a certain building or
construction project
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What method for getting the cost target can be calculated by obtaining
the average cost of similar accommodation
PREVIOUS COST ANALYSIS
APPROXIMATE QUANTITIES
ADJUSTMENT PRICE LEVEL
FIXED COST
3.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Cost check over than Cost target
Redesign
the elements so cost
target is not changing.
Ask additional
money from client
Cost is established
and agreed upon
Cut the cost
4.
FILL IN THE BLANKS QUESTION
1 min • 1 pt
PHASE 2
(a)
5.
FILL IN THE BLANKS QUESTION
1 min • 1 pt
DESIGN TO COST
(a)
6.
FILL IN THE BLANKS QUESTION
1 min • 1 pt
TO COST TARGET
(a)
7.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
PHASE 2
INCEPTION
OUTLINE PROPOSAL
SCHEME DESIGN
DETAIL DESIGN
BQ
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?