GMJ 9189 Phase 3 -Hot water - work sheet 4
Authored by Glen Johnson
Other
Professional Development
Used 8+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
9 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Name the four documents that should be followed when commissioning a hot water system.
The Water Supply (Water Fittings) Regulations
BSEN806
Building Regulations Part J
Building Regulations Part G
Manufacturer’s instructions
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What could be a problem when initially filling an open vented system?
Pump leaking
Airlocks
Constantly running cold water
Pump not started
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Before initially filling an unvented system, what item should be charged?
shock arrestor
Cylinder
Customer
Expansion vessel
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following British Standards outlines the soundness test for pipework?
BS12056
BSEN5443
BSEN806
BS1212
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Describe why flushing a system out is important to the commissioning process.
It removes any debris and contaminants from the system
It checks for leaks
It disinfects the pipe work and kills bacteria
It protects against the risk of stagnation.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What tools are used to gain the following readings - Temperatures?
Flow cup/Weir gauge
Thermometer
Pressure gauge
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What tools are used to gain the following readings - Flow Rate?
Flow cup/Weir gauge
Thermometer
Pressure gauge
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?