Boosted Cold Water Systems L3P1.U5.LO2.1.p3.

Boosted Cold Water Systems L3P1.U5.LO2.1.p3.

Professional Development

10 Qs

quiz-placeholder

Similar activities

me play fortnite

me play fortnite

Professional Development

10 Qs

Physics

Physics

8th Grade - Professional Development

10 Qs

SIDP Recap

SIDP Recap

Professional Development

10 Qs

Military Fitness

Military Fitness

Professional Development

10 Qs

Mothers Competition

Mothers Competition

Professional Development

10 Qs

ellie is naughty

ellie is naughty

KG - Professional Development

10 Qs

In Center of Gravity

In Center of Gravity

Professional Development

10 Qs

(STC JNTU) Sample Test on General Knowledge

(STC JNTU) Sample Test on General Knowledge

University - Professional Development

14 Qs

Boosted Cold Water Systems L3P1.U5.LO2.1.p3.

Boosted Cold Water Systems L3P1.U5.LO2.1.p3.

Assessment

Quiz

Physics

Professional Development

Practice Problem

Medium

Created by

Craig Boothright

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a break cistern in the indirect boosted to a storage cistern system?

To provide a 'break' between the mains cold water and the system it is supplying

To store water before it is boosted to the system

To filter the air vent

To control the water level in the high-level cistern

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the range of pressure for mains cold supplies in the UK?

1bar to 4bar

5bar to 8bar

2bar to 5bar

3bar to 7bar

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a float switch in the high-level cistern?

To control the pump when the water level drops

To prevent insects and vermin from entering the cistern

To increase the water pressure

To control the water temperature

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum flow rate output that the break cistern should be able to store?

15 minutes of pumps maximum flow rate output

30 minutes of pumps maximum flow rate output

10 minutes of pumps maximum flow rate output

20 minutes of pumps maximum flow rate output

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the pipeline switch in the header by-pass?

To start the pumps when the water level in the header falls

To control the water level in the high-level cistern

To filter the air vent

To prevent insects and vermin from entering the cistern

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the boosted cold water system?

To store water before it is boosted to the system

To increase the water pressure

To control the water temperature

To lift the water to a cistern for distribution to the outlets below

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the function of the high-level cisterns in the boosted cold water system?

To supply drinking water only

To filter the air vent

To control the water temperature

To supply non-drinking water only

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?