QUALITY CONTROL

QUALITY CONTROL

Professional Development

10 Qs

quiz-placeholder

Similar activities

WI-CE.SE-43 PM M7  - Pretest

WI-CE.SE-43 PM M7 - Pretest

Professional Development

10 Qs

CLASE 2 LABORATORIO 1

CLASE 2 LABORATORIO 1

Professional Development

11 Qs

Sales CI Quiz

Sales CI Quiz

Professional Development

15 Qs

Method Verification in Chemical Pathology

Method Verification in Chemical Pathology

Professional Development

8 Qs

AP Quiz Day1

AP Quiz Day1

Professional Development

6 Qs

QUIZ INCOMING 02-21

QUIZ INCOMING 02-21

Professional Development

10 Qs

Analysis Quiz- Analyser

Analysis Quiz- Analyser

Professional Development

10 Qs

2_การวางแผนกำลังพล, เครื่องมือ, อุปกรณ์, Estimate Cost (QC)

2_การวางแผนกำลังพล, เครื่องมือ, อุปกรณ์, Estimate Cost (QC)

Professional Development

10 Qs

QUALITY CONTROL

QUALITY CONTROL

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Norhayati Hakim

Used 12+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Quality control is an aspect of quality assessment used to maintain the quality in the laboratory.

True or False?

TRUE

FALSE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is recommended to use at least one level of control for each analyte to monitor daily IQC performance.

Tru or False?

TRUE

FLASE

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The following statements are TRUE regarding L-J chart EXCEPT:

The most commonly used charts to monitor quality control results.

The deviation of the results from the mean, especially when the results are greater than mean±2SD from the mean, indicates the rejection of the run.

If the plot trend shows bias within 1SD after 10 runs, we have to establish the mean and SD.

L-J chart should be monitored daily and periodically to assess the analyzer performance.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

This rule should only be interpreted within-run, not between-run.

TRUE or FALSE?

TRUE

FALSE

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This rule is used as a warning rule to trigger careful inspection of the control data.

The mentioned rule is referring to ___________.

Media Image
Media Image

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

The following issues can be suspected to be the root cause of the 1 3S rule violation EXCEPT:

QC material is not mixed well before analysis.

The operator used the wrong reagents.

The user has not performed daily maintenance.

The QC material is deteriorated.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

Laboratory X has TWO coagulation analyzers. As shown in the picture, one of the analyzers has an issue with the IQC performance. Which of the following could be suspected as the root cause?

Stability of reagents

The reagent was not calibrated.

Systematic error

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?