Phase 1: Plumbing processes pp7

Phase 1: Plumbing processes pp7

Professional Development

7 Qs

quiz-placeholder

Similar activities

BFT quiz

BFT quiz

Professional Development

4 Qs

LARO 21: Synergy - Building Utilities

LARO 21: Synergy - Building Utilities

Professional Development

10 Qs

Rhythm, Unity, and Character

Rhythm, Unity, and Character

University - Professional Development

12 Qs

 Smart Home Prototype

Smart Home Prototype

Professional Development

10 Qs

BEST PROGRAM 2024 (SDPB)

BEST PROGRAM 2024 (SDPB)

Professional Development

10 Qs

architecture

architecture

KG - Professional Development

12 Qs

C & G 6219 Level 1 Certificate in Construction Skills Quiz

C & G 6219 Level 1 Certificate in Construction Skills Quiz

Professional Development

8 Qs

Vocabulary 2

Vocabulary 2

Professional Development

8 Qs

Phase 1: Plumbing processes pp7

Phase 1: Plumbing processes pp7

Assessment

Quiz

Architecture

Professional Development

Hard

Created by

Steve Watson

Used 7+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended distance to mark on a timber joist for notching?

0.5m

2.5m

0.28m

1.5m

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When drilling into masonry, what type of drill action is required?

Variable speed

No hammer action

Hammer action

Diamond core bits

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum depth for a vertical chase cut into a wall?

1/6th of the wall thickness

1/2 of the wall thickness

1/4th of the wall thickness

1/3rd of the wall thickness

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be worn when cutting chases in a wall?

Ear protection, gloves, boots, overalls

Gloves, helmet, mask, boots

Goggles, ear protection, overalls, dust mask

Hard hat, safety vest, gloves, goggles

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the best practice for installing hot and cold water pipes in a wall?

Use a hammer and chisel

Use a wall chasing machine

Surface mount them for access

Conceal them within the wall

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum distance a hole can go into a timber joist?

40% of the span

30% of the span

20% of the span

50% of the span

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the statutory nature of a 'regulation'?

It is a recommendation

It is the law

It is a suggestion

It is a guideline