
Monthly Code Quiz May
Authored by Robert Starcher
Professional Development
Professional Development
Used 13+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
FILL IN THE BLANKS QUESTION
15 mins • 10 pts
When testing a fire pump, which section reference states, "The pressure relief valve shall also be observed during each flow condition to determine whether the pressure relief valve closes at the proper pressure." Hint= Answer is 5 numbers long _._._._._
(a)
2.
FILL IN THE BLANKS QUESTION
15 mins • 10 pts
Hydrants are required to be flow tested at least (a) .
3.
MULTIPLE CHOICE QUESTION
15 mins • 10 pts
System water supply tank heating systems without a supervised low temperature alarm connected to a constantly attended location shall be inspected ________ during the heating season.
daily
weekly
monthly
quarterly
4.
MULTIPLE CHOICE QUESTION
15 mins • 10 pts
Dry Pendent sprinklers shall be tested after ______ years.
5
10
15
20
Answer explanation
While this frequency has changed from edition to edition, this test is based on NFPA 25 2020 edition.
5.
FILL IN THE BLANKS QUESTION
15 mins • 10 pts
An outside screw & yoke valve is required to be lubricated (a) .
6.
MULTIPLE CHOICE QUESTION
15 mins • 10 pts
Quick opening devices, if provided, shall be tested ________.
weekly
monthly
quarterly
annually
7.
MULTIPLE CHOICE QUESTION
15 mins • 10 pts
When performing maintenance on a standard pressure proportioner, automatic type ball drips shall be ________.
checked for leakage
disassembled,cleaned, and reassembled
replaced
rebuilt with new internal parts
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?