Electrical Inspection and Testing Quiz

Electrical Inspection and Testing Quiz

Professional Development

15 Qs

quiz-placeholder

Similar activities

Electrical Inspection and Testing Quiz

Electrical Inspection and Testing Quiz

Professional Development

15 Qs

18th Edition appendices mock 3

18th Edition appendices mock 3

Professional Development

10 Qs

18th Edition Part 4 Mock 3

18th Edition Part 4 Mock 3

Professional Development

10 Qs

Thermal Insulation

Thermal Insulation

Professional Development

10 Qs

UNIT-2_FET_Quiz_EDC

UNIT-2_FET_Quiz_EDC

Professional Development

20 Qs

Transformer NLC Texas Edison Team 2 Quiz 04/16/2024

Transformer NLC Texas Edison Team 2 Quiz 04/16/2024

Professional Development

20 Qs

18th Edition Part 4 Mock 2

18th Edition Part 4 Mock 2

Professional Development

10 Qs

Earth Continuity Testing & Fault Finding

Earth Continuity Testing & Fault Finding

Professional Development

10 Qs

Electrical Inspection and Testing Quiz

Electrical Inspection and Testing Quiz

Assessment

Quiz

Other

Professional Development

Medium

Created by

Dean Kirby

Used 3+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is initial verification according to the regulations?

The final inspection and test on a new installation or a new circuit

The first inspection and test on a new installation or a new circuit

The inspection and test of an installation that is not new

The inspection and test of an existing installation or circuit

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done on completion of the verification according to the regulations?

Prepare a list of defects for the customer

Prepare a certificate for the customer

Prepare a quotation for the customer

Prepare a report for the customer

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum insulation resistance reading for a new installation?

Above 100 kilo ohms

Above 100 mega ohms

Above 1 mega ohm

Above 10 mega ohms

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the correct sequence of testing for an installation?

Insulation resistance, continuity of conductors, polarity, earth fault loop impedance

Polarity, insulation resistance, continuity of conductors, earth fault loop impedance

Continuity of conductors, insulation resistance, polarity, earth fault loop impedance

Continuity of conductors, polarity, insulation resistance, earth fault loop impedance

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of periodic testing according to the regulations?

To identify installation defects

To verify the installation before being put into service

To advise the client on the safety of the installation

To ensure the installation is safe for continued use

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must an inspector not do according to the regulations?

Partially dismantle an installation in order to carry out an inspection and test

Advise the client that installations to previous editions of regulations are unsafe

Work on a dead circuit

Identify installation defects

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the process after an electrical installation condition report deems an installation unsatisfactory?

A list of defects and observations must be created

The installation must be isolated immediately

The installation must be declared satisfactory

The installation must be reinspected

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?