6035 | Central Heating LO1 Part 2

6035 | Central Heating LO1 Part 2

Professional Development

14 Qs

quiz-placeholder

Similar activities

6035 | Central Heating LO2

6035 | Central Heating LO2

Professional Development

14 Qs

Water Mains and Water Supply Systems Quiz

Water Mains and Water Supply Systems Quiz

Professional Development

15 Qs

L1AM05

L1AM05

Professional Development

12 Qs

6035 | Electrical Principles LO6

6035 | Electrical Principles LO6

Professional Development

13 Qs

SFT ALL NEW PCX 160 (02)

SFT ALL NEW PCX 160 (02)

Professional Development

15 Qs

6035 | Processes LO1

6035 | Processes LO1

Professional Development

11 Qs

Mrs. Riel's Class

Mrs. Riel's Class

KG - Professional Development

10 Qs

Hot and cold water 2

Hot and cold water 2

Professional Development

11 Qs

6035 | Central Heating LO1 Part 2

6035 | Central Heating LO1 Part 2

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

George Harding

Used 96+ times

FREE Resource

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The open vent to the F&E cistern must rise how far above the water level?

150mm

200mm

450mm

1000mm

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The circulator should be located a minimum of _____ below the F&E.

1 metre

2 metres

5 metres

7.5 metres

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The British Standards governing the float operated valves is?

BS EN 806

BS 6700

BS 8000

BS 1212

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much does the system water expand by when heated?

4%

10%

1,600 times

0%

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The purpose of an air separator is?

To allow close coupled pipework when positioning the cold feed and vent pipe

To compensate for pressure differences when systems are not fully pumped

To allow additional connections when installing the S-plan system

To allow pressure relief when the water has expanded

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The maximum distance between the vent pipe and cold feed on a H-frame configuration is?

200mm

175mm

150mm

100mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does port A for the three port mid-position valve control?

The flow for the boiler

Central heating

Hot water

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?