GMJ 7202 copper pipe MCQ

GMJ 7202 copper pipe MCQ

Professional Development

20 Qs

quiz-placeholder

Similar activities

Plumbing

Plumbing

Professional Development

15 Qs

Common Plumbing Processes 6035-02 | Quiz 2

Common Plumbing Processes 6035-02 | Quiz 2

Professional Development

17 Qs

Domestic hot water systems

Domestic hot water systems

12th Grade - Professional Development

15 Qs

L3 YR2 Revision 3 (Cold 3)

L3 YR2 Revision 3 (Cold 3)

Professional Development

20 Qs

BIMTEK Peningkatan Kinerja Penyelenggara SPAM Prov. Jawa Tengah

BIMTEK Peningkatan Kinerja Penyelenggara SPAM Prov. Jawa Tengah

Professional Development

20 Qs

CPL Acft Tech -Fuel injection, Super/Turbocharging, Exhaust

CPL Acft Tech -Fuel injection, Super/Turbocharging, Exhaust

Professional Development

15 Qs

Nat'l Plumbing Code Q4

Nat'l Plumbing Code Q4

University - Professional Development

25 Qs

WCS 1106-3 - Knowledge Assessment

WCS 1106-3 - Knowledge Assessment

Professional Development

20 Qs

GMJ 7202 copper pipe MCQ

GMJ 7202 copper pipe MCQ

Assessment

Quiz

Other

Professional Development

Easy

Created by

Glen Johnson

Used 37+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

List two gases used for heat producing equipment used in the plumbing industry.

Methane

Propane

Oxygen

Mapp

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

State how gases used for heat producing equipment should be transported and stored. (select 4 answers)

Upright

Outside

Inside

Well ventilated

Secure

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

List the requirements for visual inspection of heat producing equipment ( blow torches etc).

Check for no damage to the regulator by inspecting the thread

Check for no damage/splits to the hose

Check for no damage to the blow torch - loose or wobbly/unsecure/bits missing etc

Check the gas smells like the right gas

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the first thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the second thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the third thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the last thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?