Search Header Logo

GMJ 7202 copper pipe MCQ

Authored by Glen Johnson

Other

Professional Development

Used 40+ times

GMJ 7202 copper pipe MCQ
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

22 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

List two gases used for heat producing equipment used in the plumbing industry.

Methane

Propane

Oxygen

Mapp

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

State how gases used for heat producing equipment should be transported and stored. (select 4 answers)

Upright

Outside

Inside

Well ventilated

Secure

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

List the requirements for visual inspection of heat producing equipment ( blow torches etc).

Check for no damage to the regulator by inspecting the thread

Check for no damage/splits to the hose

Check for no damage to the blow torch - loose or wobbly/unsecure/bits missing etc

Check the gas smells like the right gas

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the first thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the second thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the third thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the last thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?