Search Header Logo

6035 | Central Heating LO1 Part 3

Authored by George Harding

Professional Development

Professional Development

Used 126+ times

6035 | Central Heating LO1 Part 3
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Building Regulations that cover heat producing appliances?

Part A

Part L

Part G

Part J

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct option from the description given: Before installing, the incoming pressure and flow rates in the property needs to be checked.

Combination boiler

Convectional boiler

System boiler

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Statement: LPG fired boilers are supplied from the national grid, along with natural gas and electricity.

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To be fitted, condensing boilers must be:

LPG fired

Electrically supplied

SEDBUK rated A

Part P compliant

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a system is open vented, what type of boiler is required?

Conventional boiler

Combination boiler

System boiler

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The symbol shown here is?

Double check valve

Single check valve

Radiator valve

Gate valve

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The boiler that used two heat exchangers to heat up the system?

Traditional boilers

Condensing boilers

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?