33 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Meralco absorbs Meralco absorbs around __% of generated power in the entire country.

50

55

52

53

54

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. The Meralco distribution system is mostly 

underground line

looped line

radial line

sectorized line

none of the above

3.

FILL IN THE BLANKS QUESTION

1 min • 1 pt

The voltage level of Meralco’s sub-transmission network is mostly

(a)  

4.

FILL IN THE BLANKS QUESTION

1 min • 1 pt

Paco Delivery point substation belongs to

(a)  

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Red Alert notice is being given by the System Operator when:

Sector 1

Sector 2

Sector 3

Laguna Sector

Manila Sector

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Red Alert notice is being given by the System Operator when:

Contingency reserve is zero

Generation deficiency exist

There is critical loading

Imminent overloading of transmission lines or equipment

 all of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Meralco, ILP means

Information Leak Prevention

Inner Line Permit

 Independent Labor Party

 Interruptible Load Program

Individual Learning Plan

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?