PP 11 Central Heating System Quiz

PP 11 Central Heating System Quiz

Professional Development

10 Qs

quiz-placeholder

Similar activities

Climate Change Vocabulary

Climate Change Vocabulary

Professional Development

11 Qs

Air can be compressed

Air can be compressed

1st Grade - Professional Development

8 Qs

Functions of Cortical Areas

Functions of Cortical Areas

10th Grade - Professional Development

13 Qs

Chapter 13: Electrical Safety

Chapter 13: Electrical Safety

Professional Development

9 Qs

Daily General Knowledge Quiz - Part I Physics

Daily General Knowledge Quiz - Part I Physics

KG - Professional Development

10 Qs

sepration of substances

sepration of substances

5th Grade - Professional Development

11 Qs

Central Heating Quiz phase 2 LO1.4/1

Central Heating Quiz phase 2 LO1.4/1

Professional Development

15 Qs

Earth Changing Climate Vocabulary

Earth Changing Climate Vocabulary

Professional Development

11 Qs

PP 11 Central Heating System Quiz

PP 11 Central Heating System Quiz

Assessment

Quiz

Science

Professional Development

Medium

Created by

jon May

Used 14+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended test duration according to BS14336?

3 hours

2 hours

1 hour

4 hours

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the system test pressure for a sealed system with an operating pressure of 1 bar?

0.5 bar

1 bar

2 bar

1.5 bar

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of cold flushing a central heating system?

To remove excess flux

To remove debris from the installation process

To remove excess jointing compounds

To remove hydrogen from the system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the process of releasing trapped air or hydrogen from the top of a radiator called?

Balancing

Bleeding

Flushing

Filling

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done before working on any electrical component, including the boiler?

Lock off the fuse holder ( safe isolation )

Remove the fuse from the boiler

Switch off the central heating system

Switch off the boiler

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of balancing the system when the system is commissioned?

To switch off the central heating system

To remove hydrogen from the system

To remove debris from the installation process

To ensure uniform heating of radiators

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended temperature difference between the flow and return pipework when the system is warm?

10ºC

9ºC

8ºC

11ºC

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?