PP 12 Central Heating Decommissioning Quiz

PP 12 Central Heating Decommissioning Quiz

Professional Development

6 Qs

quiz-placeholder

Similar activities

Cold Water Systems Quiz L3P2 U5,2.4:5

Cold Water Systems Quiz L3P2 U5,2.4:5

Professional Development

10 Qs

Steam System & Air System

Steam System & Air System

Professional Development

10 Qs

Basic Human Biology

Basic Human Biology

6th Grade - Professional Development

10 Qs

MyReskill IoT

MyReskill IoT

10th Grade - Professional Development

10 Qs

Flow Diagram Emergency Dumai Area

Flow Diagram Emergency Dumai Area

Professional Development

10 Qs

PCG MCQ - Srihari Siddhartha

PCG MCQ - Srihari Siddhartha

Professional Development

10 Qs

Maintenance

Maintenance

Professional Development

10 Qs

Quiz 5 - OSH Coordinator - Topik 7 - HIRA

Quiz 5 - OSH Coordinator - Topik 7 - HIRA

4th Grade - Professional Development

10 Qs

PP 12 Central Heating Decommissioning Quiz

PP 12 Central Heating Decommissioning Quiz

Assessment

Quiz

Science

Professional Development

Medium

Created by

jon May

Used 5+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the two types of decommissioning to consider for plumbing systems?

Enduring and Brief

Complete and Partial

Long-term and Short-term

Permanent and Temporary

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be considered before decommissioning a gas-fired central heating system for a boiler replacement?

Isolation of services, gas safety, cold feed isolation, electrical standards

Effect on other systems, need for temporary heating, impact on DHW services, customer awareness

Gas isolation, water draining, electrical supplies, inhibitor disposal

Venting air, replacing radiator valve heads, using continuity bonds, gas tight disconnection

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be considered when decommissioning the system to enable draining?

Gas isolation, temporary heating, effect on DHW services, accessible isolation

Disconnecting mains cold water, using integral filling loops, following Safe Isolation procedure, disposal of chemicals

Isolation of cold feed, venting air, disposal of inhibitors, replacing radiator valve heads

Isolation of electrical supplies, venting air, removing water, using continuity bonds

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is important to remember when removing water from a sealed system?

Opening a vent on a radiator at high level, disposing of inhibitors, replacing radiator valve heads, using continuity bonds

Isolating cold feed, disconnecting mains water, following Safe Isolation procedure, venting air

Using temporary continuity bonds, replacing radiator valve heads, following gas safety standards, venting air

Using integral filling loops, following Safe Isolation procedure, disposing of chemicals, isolating electrical supplies

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done with thermostatic radiator valve heads when the radiators are removed?

Replace with manual caps

Dispose of them

Keep them for future use

Leave them as is

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is important to consider when removing any metallic pipework for alteration or repair?

Using temporary continuity bonds to maintain earth continuity

Disconnecting electrical supplies

Isolating gas and water

Following Safe Isolation procedure