
PP 12 Central Heating Decommissioning Quiz
Authored by jon May
Science
Professional Development
Used 5+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
6 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the two types of decommissioning to consider for plumbing systems?
Enduring and Brief
Complete and Partial
Long-term and Short-term
Permanent and Temporary
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be considered before decommissioning a gas-fired central heating system for a boiler replacement?
Isolation of services, gas safety, cold feed isolation, electrical standards
Effect on other systems, need for temporary heating, impact on DHW services, customer awareness
Gas isolation, water draining, electrical supplies, inhibitor disposal
Venting air, replacing radiator valve heads, using continuity bonds, gas tight disconnection
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be considered when decommissioning the system to enable draining?
Gas isolation, temporary heating, effect on DHW services, accessible isolation
Disconnecting mains cold water, using integral filling loops, following Safe Isolation procedure, disposal of chemicals
Isolation of cold feed, venting air, disposal of inhibitors, replacing radiator valve heads
Isolation of electrical supplies, venting air, removing water, using continuity bonds
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is important to remember when removing water from a sealed system?
Opening a vent on a radiator at high level, disposing of inhibitors, replacing radiator valve heads, using continuity bonds
Isolating cold feed, disconnecting mains water, following Safe Isolation procedure, venting air
Using temporary continuity bonds, replacing radiator valve heads, following gas safety standards, venting air
Using integral filling loops, following Safe Isolation procedure, disposing of chemicals, isolating electrical supplies
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done with thermostatic radiator valve heads when the radiators are removed?
Replace with manual caps
Dispose of them
Keep them for future use
Leave them as is
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is important to consider when removing any metallic pipework for alteration or repair?
Using temporary continuity bonds to maintain earth continuity
Disconnecting electrical supplies
Isolating gas and water
Following Safe Isolation procedure
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?