1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the two types of decommissioning to consider for plumbing systems?

Enduring and Brief

Complete and Partial

Long-term and Short-term

Permanent and Temporary

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be considered before decommissioning a gas-fired central heating system for a boiler replacement?

Isolation of services, gas safety, cold feed isolation, electrical standards

Effect on other systems, need for temporary heating, impact on DHW services, customer awareness

Gas isolation, water draining, electrical supplies, inhibitor disposal

Venting air, replacing radiator valve heads, using continuity bonds, gas tight disconnection

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be considered when decommissioning the system to enable draining?

Gas isolation, temporary heating, effect on DHW services, accessible isolation

Disconnecting mains cold water, using integral filling loops, following Safe Isolation procedure, disposal of chemicals

Isolation of cold feed, venting air, disposal of inhibitors, replacing radiator valve heads

Isolation of electrical supplies, venting air, removing water, using continuity bonds

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is important to remember when removing water from a sealed system?

Opening a vent on a radiator at high level, disposing of inhibitors, replacing radiator valve heads, using continuity bonds

Isolating cold feed, disconnecting mains water, following Safe Isolation procedure, venting air

Using temporary continuity bonds, replacing radiator valve heads, following gas safety standards, venting air

Using integral filling loops, following Safe Isolation procedure, disposing of chemicals, isolating electrical supplies

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done with thermostatic radiator valve heads when the radiators are removed?

Replace with manual caps

Dispose of them

Keep them for future use

Leave them as is

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is important to consider when removing any metallic pipework for alteration or repair?

Using temporary continuity bonds to maintain earth continuity

Disconnecting electrical supplies

Isolating gas and water

Following Safe Isolation procedure

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?