Geotechnical Report 10a

Geotechnical Report 10a

Professional Development

6 Qs

quiz-placeholder

Similar activities

Natural Disasters

Natural Disasters

7th Grade - Professional Development

10 Qs

Geotechnical Engineering ch5

Geotechnical Engineering ch5

Professional Development

7 Qs

Bible

Bible

University - Professional Development

6 Qs

What do you know about cities and their impacts? V2

What do you know about cities and their impacts? V2

Professional Development

8 Qs

Soils, Earthwork,Foundation ch.2

Soils, Earthwork,Foundation ch.2

Professional Development

11 Qs

Construction Site Preparation ch.10b

Construction Site Preparation ch.10b

Professional Development

5 Qs

Sudan

Sudan

2nd Grade - Professional Development

5 Qs

World Monuments

World Monuments

KG - Professional Development

10 Qs

Geotechnical Report 10a

Geotechnical Report 10a

Assessment

Quiz

Geography

Professional Development

Easy

Created by

Rob Marq

Used 13+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of recommendation would not typically be included in a geotechnical report?

Pavement thickness

Degree of compaction

.Height of the structure

Footing depth and width

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which item is the most important to be performed before any underground work is started?

Draw a sketch of the site.

.Have existing underground utilities located.

Decide how many boreholes you will need to drill.

Set up a pre-grade meeting.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the Earthwork Recommendations section, which of the following type of soil or conditions was not addressed?

Rock fill

Transition pads

.Expansive soil

On-site material

None of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the boring and trench logs, at a depth of 1 ft or deeper in the southern portion of the site, expansive soils are expected to be encountered.

True

.False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Cut slopes excavated into undisturbed Mehrten breccia or conglomerate should be stable if cut no steeper than 1:1.

True

.False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Regarding fill slopes, which one of the following statements is false?

.If a keyway is placed at the toe of a 3:1 slope no benching is necessary while placing the rest of the slope fill.

Fill slopes must be built from the bottom up—not pushed out from the top.

Track walking slopes for compaction is not acceptable.

The keyway shall be a minimum of 15 ft wide and sloped downward into the slope at 2%.