What is the definition of Elemental Cost Analysis?
A systematic breakdown of the cost of a building for a client to determine the cost of each element.
A summary of the total cost of a building project.
A detailed analysis of the structural components of a building.
A breakdown of the cost of labor in a construction project.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why was Elemental Cost Analysis first initiated?
To prepare a summary of the total cost of a building project.
To provide a detailed analysis of the structural components of a building.
To determine the cost of labor in construction projects.
To compare the cost of two similar building types.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of Elemental Cost Analysis preparation?
To serve as a reference for estimating the cost of a proposed building.
To provide a detailed analysis of the structural components of a building.
To prepare a summary of the total cost of a building project.
To determine the cost of labor in construction projects.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What documents are required for the preparation of Elemental Cost Analysis?
Complete contract document, working drawings and specification, tender report.
Building permits, environmental impact assessment, land survey report.
Architectural sketches, material samples, project timeline.
Construction equipment list, safety regulations, project budget.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is Form 2 used for in Elemental Cost Analysis preparation?
Contain summary of the elements cost.
Provide brief picture of the building standard and quality.
List and content of elements.
Systematic breakdown of the cost of elements of a building.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is an important note to consider when using Elemental Cost Analysis for estimation?
Cost Analysis is prepared based on the actual construction progress.
Cost Analysis is used for determining the project timeline.
Cost Analysis is based on the actual sum as in Final Account.
Cost Analysis is not sufficient to determine the actual price.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How can Elemental Cost Analysis be used for decision making?
Provides a detailed breakdown of the structural components of a building.
Used to prepare a summary of the total cost of a building project.
Enables clients and designers to develop ideas on how cost of elements can be allocated and obtain more balance design.
Used to compare the cost of labor in construction projects.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?