316 - 350

316 - 350

Professional Development

35 Qs

quiz-placeholder

Similar activities

9C CONSTITUTION

9C CONSTITUTION

KG - Professional Development

40 Qs

HSC Crime and Human Rights

HSC Crime and Human Rights

12th Grade - Professional Development

30 Qs

economics

economics

Professional Development

35 Qs

STATISTIK

STATISTIK

Professional Development

31 Qs

soal fintech

soal fintech

Professional Development

37 Qs

EC-6 SS

EC-6 SS

Professional Development

33 Qs

@ RA 9266: ARCHITECTURE ACT OF 2004

@ RA 9266: ARCHITECTURE ACT OF 2004

Professional Development

38 Qs

Magruder 20.1 Due Process 20

Magruder 20.1 Due Process 20

6th Grade - Professional Development

33 Qs

316 - 350

316 - 350

Assessment

Quiz

Social Studies

Professional Development

Easy

Created by

pgfyi fernandobrasil@p2e.com.br

Used 2+ times

FREE Resource

35 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For bundled bars, minimum concrete cover shall be equal to the equivalent diameter of the bundle, but need not be greater than ____ in.; except for concrete cast against and permanently exposed to earth, where minimum cover shall be 3 inches.

2

1

3/4

3

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Reinforcement partially embedded in concrete shall not be field _______, except as shown on the design drawings or permitted by the engineer.

Bent

Modified

Cut

Welded

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

High-early-strength concrete shall be maintained above ______ degrees F and in a moist condition for at least the first ____ days, except when cured in accordance with 5.11.3

50, 3

50, 7

40, 7

40, 3

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When approved by the building official; water may be present at the place of deposit when ________.

The concrete is 5000 psi

Footings are being poured in the rain

A tremie is used

The concrete is type III with minimum F’c of 2500 psi

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The upper most bar rank indicates ______.

Mill

Grade

Steel type

Size

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling rebar, crossing bars should not be _______.

Welded

Held with plastic clips

Galvanized tie wire

Stainless steel tie wire

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During a 400 yard placement, ______ samples for strength tests are required.

2

3

4

8

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?