Construction and Excavation Safety Quiz

Construction and Excavation Safety Quiz

University

10 Qs

quiz-placeholder

Similar activities

BIM 2 QZ-01

BIM 2 QZ-01

University

15 Qs

Functional Areas of Management

Functional Areas of Management

University

10 Qs

Building Laws Quiz 2- PD 1096

Building Laws Quiz 2- PD 1096

KG - Professional Development

15 Qs

Mimari qad aldunia quiz

Mimari qad aldunia quiz

University

14 Qs

Roof Trusses

Roof Trusses

University

12 Qs

ARCHITECTURE TRIVIA

ARCHITECTURE TRIVIA

University

10 Qs

Antoni Gaudi and Sagrada Familia Quiz

Antoni Gaudi and Sagrada Familia Quiz

University

10 Qs

Professional Practice Quiz#2

Professional Practice Quiz#2

University

10 Qs

Construction and Excavation Safety Quiz

Construction and Excavation Safety Quiz

Assessment

Quiz

Architecture

University

Practice Problem

Hard

Created by

Syamim .

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the process of moving earth, rock, or other materials with tools, equipment, or explosives?

Compaction

Trenching

Excavation

Earthwork

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the purpose of setting out and establishing Temporary Benchmarks (TBM) in construction projects?

To ensure accuracy, alignment, and quality control

To provide a reference for measurements and elevation

To determine the location of boundary

To verify the position of underground installations

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the uppermost layer of soil, typically rich in organic matter and nutrients, and is crucial for supporting plant life?

Bedrock

Fill materials

Subsoil

Topsoil

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the first step in site construction work after site clearing?

Excavation

Compaction

Cut and fill

Trenching

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the main purpose of a TBM (Temporary Benchmark) in construction and surveying?

To establish the position of underground installations

To provide a fixed known level on site

To ensure the accuracy of excavation

To determine the location of boundary

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the primary cause of excavation and trenching accidents according to the text?

Subsidence

Heaving or Squeezing

Toppling

Cave-in

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the main purpose of soil nailing in excavation support systems and retaining walls?

To provide temporary support for the excavation wall

To eliminate the need for shoring or shielding

To create a stable mass of soil

To prevent sliding failure

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?