Tools and equipment required to install​ rain water goods​

Tools and equipment required to install​ rain water goods​

University

9 Qs

quiz-placeholder

Similar activities

Eclipse cross product quiz

Eclipse cross product quiz

University

12 Qs

V-Series Training Assessment

V-Series Training Assessment

KG - Professional Development

12 Qs

Hypixel Skyblock

Hypixel Skyblock

KG - Professional Development

10 Qs

Mant. P

Mant. P

University

10 Qs

Hydronic Heating Terms and Definitions

Hydronic Heating Terms and Definitions

University

10 Qs

UNI1170 Handbook & Syllabus Quiz

UNI1170 Handbook & Syllabus Quiz

University

12 Qs

Gagne's Nine Events of Instruction

Gagne's Nine Events of Instruction

University

7 Qs

All About Canva

All About Canva

3rd Grade - University

14 Qs

Tools and equipment required to install​ rain water goods​

Tools and equipment required to install​ rain water goods​

Assessment

Quiz

Professional Development

University

Hard

Created by

Byron Morris

FREE Resource

9 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

When installing rain water goods you will require

A Tape measure

A Level

A blow torch

A Chalk line

A line level

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

When installing rain water goods you will require

A drill

A screw driver

A multi purpose hand saw

An adjustable spanner

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many millimetres are there in 1 meter

10000

1000

100

10

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many millimetres are there in a 1 centimetre

100

10000

10

1000

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The gutter run need to be installed with a fall towards the outlet. What is the required rule?

1:600

1mm drop to every 600mm

1:300

1mm drop to every 300

1:500

1mm drop to every 500mm

1:700

1mm drop to every 700mm

6.

LABELLING QUESTION

1 min • 1 pt

Inside the outlet, where the guttering is clipped, are some markings. Label the markings

a
b
c

Water seal

Stop

Expansion line

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The reason why guttering overhangs the roof line by 50mm is to allow all the rain water to be collected inside the gutter.

Select the correct overhang allowed

50mm overhang

Max 150mm unsupported​

150mm overhang

Max 50mm unsupported​

8.

LABELLING QUESTION

1 min • 1 pt

Name the name of the end of these offset bends put together to make a swan neck.

a
b

Spigot

Socket

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The standard 68mm downpipe requires to be supported as follows:

  • Vertically: every 2.0m​

  • Horizontally: every 1.2m.​

  • Vertically: every 1.2m​

  • Horizontally: every 2.0m.