Building Control Systems Quiz Objective 4

Building Control Systems Quiz Objective 4

Professional Development

15 Qs

quiz-placeholder

Similar activities

Environmental Technology Systems Quiz

Environmental Technology Systems Quiz

Professional Development

11 Qs

Quiz 2 : Project Management

Quiz 2 : Project Management

Professional Development

10 Qs

UD 4: Construcción de carreteras

UD 4: Construcción de carreteras

Professional Development

10 Qs

Section 1_B15 Adv GATE_16.12

Section 1_B15 Adv GATE_16.12

Professional Development

16 Qs

Building Laws Quiz 1- PD 1096

Building Laws Quiz 1- PD 1096

KG - Professional Development

15 Qs

BLDG.LAWS Q1 - PD1096

BLDG.LAWS Q1 - PD1096

Professional Development

15 Qs

L: SET 0

L: SET 0

University - Professional Development

10 Qs

SPP Doc. 203 - 209

SPP Doc. 203 - 209

Professional Development

20 Qs

Building Control Systems Quiz Objective 4

Building Control Systems Quiz Objective 4

Assessment

Quiz

Architecture

Professional Development

Medium

Created by

Andgel Thomas

Used 4+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a control system schedule?

A schedule for building maintenance

A list of building materials

A detailed list specifying control system functions

A schedule for building construction

Answer explanation

A control system schedule is a detailed list specifying control system functions, outlining the specific tasks and functions to be performed by the control system.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the process of confirming all the specifications of the control system schedule for a building?

Building maintenance

Building construction

Building retro-commissioning

Building commissioning

Answer explanation

Building commissioning involves confirming all the specifications of the control system schedule for a building.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the process of confirming that a building is functioning according to its original control system schedule after one or two years of operation?

Building construction

Retro-commissioning

Building commissioning

Building maintenance

Answer explanation

Retro-commissioning is the process of confirming that a building is functioning according to its original control system schedule after one or two years of operation.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where can the pneumatic control system schedule be found on construction blueprints and drawings?

As addendums to the drawing package

As part of the building commissioning report

As a separate document

As details and outtakes on the mechanical or controls drawing sheet

Answer explanation

The pneumatic control system schedule can be found as details and outtakes on the mechanical or controls drawing sheet.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the level of importance and relevance of the BAS control system schedule compared to the pneumatic control system schedule?

More important

Equally important

Less important

Not relevant

Answer explanation

The BAS control system schedule is not relevant compared to the pneumatic control system schedule, as they are not directly comparable in terms of importance and relevance.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who might be included in the distribution list for the modern BAS control schedule?

Building owner, general contractor, mechanical contractor

Building owner, general contractor, electrical contractor

Building owner, general contractor, architects

Building owner, general contractor, commissioning agent

Answer explanation

The correct answer is building owner, general contractor, and commissioning agent because they are the key stakeholders involved in the modern BAS control schedule.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where are the details of the BAS control schedule default values included?

In the building maintenance manual

In the building commissioning report

On the operator interface

On the construction blueprints and drawings

Answer explanation

The details of the BAS control schedule default values are included on the operator interface, making it the correct choice.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?