1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the requirement for pressure vessels in Malaysia under the Factories and Machinery Act (1967)?

They must be accompanied by the Manufacturers Data Report

They must be manufactured by an approved workshop

They must be registered with the state Department of Occupational Safety and Health

They must be approved by the Department of Environment

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a hydrostatic test in a steam boiler?

To check the temperature of the boiler

To measure the stack temperature

To inspect the water gage glass

To ensure the boiler is free from leakage

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the requirement before performing a hydrostatic test in a steam boiler?

Use of untreated water for the test

Presence of dirt, debris, and foreign matter inside and outside of the boiler

No need for dimensional inspection

Painting work on pressure part before the test

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done after the hydrostatic test in a steam boiler?

Fill the boiler with untreated water

Release pressure in a manner that endangers personnel

Record pressure, time, and temperature during the test

Increase pressure gradually

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the stack temperature gage in a boiler?

To measure the water level

To measure the temperature of the stack

To inspect the safety valves

To control the low water fuel cutoffs

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who has the authority to inspect and examine factories and machinery under the Factories and Machinery Act (1967)?

The Chief Inspector and Inspector appointed under the Act

The Department of Environment

The registered medical practitioner

The owner of the factory

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the requirement for boiler installation and operation in Malaysia?

The authority lies with the Department of Occupational Safety and Health

The owner is not required to keep a boiler register

The boiler must be manufactured by an approved boiler-making workshop

The chimney or smoke stack design does not require approval

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?