Demolition Planning Permission Quiz

Demolition Planning Permission Quiz

Professional Development

33 Qs

quiz-placeholder

Similar activities

8202 Sanitation CJ

8202 Sanitation CJ

Professional Development

28 Qs

MHRD IIC Webseries - Quiz1 - Design Thinking- Patent

MHRD IIC Webseries - Quiz1 - Design Thinking- Patent

Professional Development

37 Qs

Final Coaching 2 for LET Sept 2023

Final Coaching 2 for LET Sept 2023

Professional Development

28 Qs

Construction Technology 1

Construction Technology 1

Professional Development

34 Qs

Personal Development- Salon Fundamentals Esthetics

Personal Development- Salon Fundamentals Esthetics

Professional Development

30 Qs

prepare-4_6-7

prepare-4_6-7

3rd Grade - Professional Development

28 Qs

CTET2020

CTET2020

Professional Development

35 Qs

Entrepreneur

Entrepreneur

Professional Development

30 Qs

Demolition Planning Permission Quiz

Demolition Planning Permission Quiz

Assessment

Quiz

Education

Professional Development

Medium

Created by

James Jones

Used 2+ times

FREE Resource

33 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is planning permission not required for the demolition of a building according to the document?

When the building is more than 100 cubic metres

When the building is less than 50 cubic metres

When the building is located in a conservation area in Wales

When the building is listed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be included in the detailed sequence of work before demolishing a building can commence?

Cost estimation and budget allocation

Isolation of all services and risk assessments and method statements

Notification of local residents

Obtaining construction materials

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What can be the result of failing to isolate gas, electricity, water supply, and telecommunications services?

Improved efficiency of services

Decreased risk of accidents

Release of toxic and explosive gases, risk of electrocution, and flooding

Enhanced communication between operatives

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should risk assessments and method statements include when removing and demolishing a property?

Only the cost of the materials involved

The specific risks and hazards associated, materials involved, and measures to prevent debris and contamination

The color and design of the property

The schedule of the workers involved in the demolition

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before beginning demolition, what environmental factor must be considered?

The cost of demolition

The environmental impact

The time it will take to demolish

The color of the building

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common practice to prevent dangerous dusts such as asbestos from leaving the site?

Ignoring it

Sealing the site with plastic

Manually removing the asbestos

Using water sprays

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be safely disconnected to reduce the chance of an explosion during demolition?

Water supply

Internet connection

Gas supplies

Alarm systems

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?