When is planning permission not required for the demolition of a building according to the document?
When the building is more than 100 cubic metres
When the building is less than 50 cubic metres
When the building is located in a conservation area in Wales
When the building is listed
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What must be included in the detailed sequence of work before demolishing a building can commence?
Cost estimation and budget allocation
Isolation of all services and risk assessments and method statements
Notification of local residents
Obtaining construction materials
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What can be the result of failing to isolate gas, electricity, water supply, and telecommunications services?
Improved efficiency of services
Decreased risk of accidents
Release of toxic and explosive gases, risk of electrocution, and flooding
Enhanced communication between operatives
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should risk assessments and method statements include when removing and demolishing a property?
Only the cost of the materials involved
The specific risks and hazards associated, materials involved, and measures to prevent debris and contamination
The color and design of the property
The schedule of the workers involved in the demolition
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Before beginning demolition, what environmental factor must be considered?
The cost of demolition
The environmental impact
The time it will take to demolish
The color of the building
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a common practice to prevent dangerous dusts such as asbestos from leaving the site?
Ignoring it
Sealing the site with plastic
Manually removing the asbestos
Using water sprays
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What must be safely disconnected to reduce the chance of an explosion during demolition?
Water supply
Internet connection
Gas supplies
Alarm systems
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?