1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Kung ang site engineer ay nag Request for NTP (RNTP) para sa isang approved budget na Labor only, alin sa mga options na ito ang dapat niyang isagot under the PR Endorsement Category?

To Proceed

Not to Proceed

Not Needed

Needed

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Alin sa mga sumusunod na attachments ang pinapasa lamang tuwing unang billing ni contractor?

RNTP

RFI

MEDF

NTP

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Sa mga area na tatambakan, ano ang maximum thickness ng loose fill na kailangan kada layer bago pa man magcompact gamit ang road roller?

25 cm

30 cm

50 cm

60 cm

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Ito ay nagsisilbing tanda o gabay para sa tamang elevation ng kalsada sa pagsisimula ng land development?

Blue Stick

Blue Top

Blue Mark

Blue Tap

5.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Ano ang standard offset ng RCP from the Property Line kung ang Right of Way ay may width na 6.50 m?

0.75 m

0.90 m

1.00 m

2.00 m

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Ano ang standard offset ng Manhole mula sa katabing property?

0.45 m

0.75 m

0.90 m

1.00 m

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Tama o Mali: Sa paglalatag ng RCP, dapat siguraduhin na ang tongue ay hindi nakaharap sa direksyon ng flow?

Tama

Mali

Pwede

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?