Central Heating Systems Quiz

Central Heating Systems Quiz

Professional Development

51 Qs

quiz-placeholder

Similar activities

Endocrine Physiology

Endocrine Physiology

University - Professional Development

50 Qs

Ipl

Ipl

5th Grade - Professional Development

50 Qs

ETC 602 - SWITCHGEAR

ETC 602 - SWITCHGEAR

Professional Development

50 Qs

अपनी भाषा अपनी बात : ग्राहक – बैंकर संवाद : प्रतियोगिता

अपनी भाषा अपनी बात : ग्राहक – बैंकर संवाद : प्रतियोगिता

Professional Development

50 Qs

SOAL TES KPPS PEMILU 2024 DESA KALIBATUR

SOAL TES KPPS PEMILU 2024 DESA KALIBATUR

Professional Development

50 Qs

SPT110

SPT110

Professional Development

47 Qs

Standar Skill Operator - Mixing Biscuit

Standar Skill Operator - Mixing Biscuit

Professional Development

56 Qs

SY0-501 Practice Quiz 8

SY0-501 Practice Quiz 8

Professional Development

50 Qs

Central Heating Systems Quiz

Central Heating Systems Quiz

Assessment

Quiz

Other

Professional Development

Practice Problem

Medium

Created by

Eugene Schutte

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

51 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum ErP efficiency percentage required for all boilers from 6 April 2018 according to the Boiler Plus regulations 2018?

85%

92%

95%

90%

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As per the Boiler Plus regulations 2018, what must all installations have fitted?

Time and cost controls

Time and temperature controls

Time and energy controls

Time and efficiency controls

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT one of the four additional requirements for combi boilers to comply with Boiler Plus regulations 2018?

Load compensation

Weather compensation

Smart control

Carbon monoxide detector

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does FGHR stand for in the context of Boiler Plus regulations 2018?

Flue gas heat recovery

Fuel gas heat retention

Flue gas humidity reduction

Fuel gas humidity recovery

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of smart control in the Boiler Plus regulations 2018?

To reduce the water usage in boilers

To allow full automation and enhanced efficiency

To control the gas emission levels

To monitor the fuel consumption

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should the three-port valve in the Y-Plan system be connected to?

The AB port, which is marked on the valve.

Directly to the electric actuator.

The nearest heat source.

The bypass valve.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where must the room thermostat be positioned in the heating circuit?

In the warmest room of the house.

Next to the boiler.

Positioned in the coolest room (normally the hallway) away from heat sources and cold draughts.

Outside the house for better temperature measurement.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?